AMI Oxytrace QED
Installation
A-96.250.531 / 300617
23
3.3.
Connecting Sample Inlet and Outlet
3.3.1
Swagelok Fitting Stainless Steel at Sample Inlet
Preparation
Cut the tube to length and deburr it. The tube must be straight and
free from blemishes for approximately 1,5 x tube diameter from the
end.
Lubrication with lubricating oil, MoS2, Teflon etc. is recommended
for the assembly and reassembly of bigger sized unions (thread,
compression cone).
Installation
1
Insert the compression ferrule [C] and the compression
cone [D] into the union nut [B].
2
Screw on the union nut onto the body, do not tighten it.
3
Push the stainless steel pipe through the union nut as far as it
reaches the stop of the body.
4
Mark the union nut at 6 o’clock position.
5
While holding the fitting body steady, tighten the nut union 1¼
rotation using an open ended spanner.
A
B
C
Stainless steel tube
Union nut
Compression ferrule
D
E
F
Compression cone
Body
Tightened connection
12
3
9
6
A
B
C D
E
F
Summary of Contents for AMI Oxytrace
Page 1: ...AMI Oxytrace AMI Oxytrace QED Version 6 20 and higher A 96 250 531 300617 Operator s Manual...
Page 5: ...AMI Oxytrace QED A 96 250 531 300617 3 11 Default Values 90 12 Index 93 13 Notes 94...
Page 96: ...94 A 96 250 531 300617 AMI Oxytrace QED Notes 13 Notes...
Page 97: ...AMI Oxytrace QED Notes A 96 250 531 300617 95...