36
A-96.250.571 / 050517
AMI Codes-II
Instrument Setup
4.4.
Fill or Flush Reagent System
Fill or flush the reagent tubing:
upon the initial instrument setup,
after refilling the reagent canisters,
before a system shut-down to flush the system with deminer-
alized water until no more reagent is left in the system.
1
Check tubing and flow cell for leaks and repair if necessary.
2
Let the instrument run continuously for 1 hour.
4.5.
Programming
Programming
Program all parameters for external devices (interface, recorders,
etc.)
Program all parameters for instrument operation (disinfectant, lim-
its, alarms).
Program the DPD value of the Verikit in menu <Installation/
Sensors/Ref. Verification>.
If pH option is installed, program the two buffers you want to use for
calibration in menu <Installation/Sensors/Standards>.
See
Program List and Explanations, p. 75
.
Navigate to menu< Maintenance /
Service/Fill system>.
Press [Enter].
The peristaltic pump is activated for
1.5 minutes.
Press [Exit] 4 x to go back to the oper-
ating mode.
3.2.2
Fill System
Verification
Service
Cleaning
3.2.2.5
Fill System
Progress
<Enter> to stop
3.2.2.5
Fill System
Progress
Done