![Swann AMI Codes-II CC Operator'S Manual Download Page 24](http://html1.mh-extra.com/html/swann/ami-codes-ii-cc/ami-codes-ii-cc_operators-manual_1411949024.webp)
22
A-96.250.581 / 220616
AMI Codes-II CC
Installation
3.4.
Installation of Flow Cell
CAUTION
Fragile Part
Handle the constant head tube with care.
To avoid damage during the transport, the constant head tube [C] of
the AMI Codes-II CC is not installed.
To install the constant head tube proceed as follows:
1
Unpack the constant head tube [C].
2
Push the constant head tube into the flow cell block [E].
3
Put the constant head cover [A] onto the constant head tube.
4
Check if the overflow tube [B] is aligned with the upper Level
mark.
A
B
C
D
E
Constant head cover
Overflow tube
Constant head tube
Gasket
Flow cell block
Level
A
B
D
C
E