![Swan Analytical Instruments AMI Codes-II O3 Operator'S Manual Download Page 81](http://html1.mh-extra.com/html/swan-analytical-instruments/ami-codes-ii-o3/ami-codes-ii-o3_operators-manual_1411369081.webp)
A-96.250.881 / 070622
AMI Codes-II O3
Program List and Explanations
81
5.3.2.44
Run Time
: see Interval
5.3.2.54
Delay
: see Interval
5.3.2.6
Signal Outputs
: see Interval
5.3.2.7
Output/Control
: see Interval
The relay contact can be activated at one or several days, of a week.
The daily starting time is valid for all days.
5.3.2.342
Calendar
:
5.3.2.342.1
Start time
: The programmed start time is valid for each of the pro
-
grammed days. To set the start time see
Range: 00:00:00–23:59:59
5.3.2.342.2
Monday
: Possible settings, on or off
to
5.3.2.342.8
Sunday
: Possible settings, on or off
5.3.2.44
Run Time
: see Interval
5.3.2.54
Delay
: see Interval
5.3.2.6
Signal Outputs
: see Interval
5.3.2.7
Output/Control
: see Interval
The relay will be switched via the Profibus input. No further parame
-
ters are needed.
This function is only available on relay 2. It is used to communicate
with canal switching instruments from third-party suppliers. The relay
closes for 1 sec. after each valid measurement. If End of Batch is
selected, no further selection is possible.
5.3.4
Input:
The functions of the relays and signal outputs can be defined
depending on the position of the input contact, i.e. no function,
closed or open.
5.3.4.1
Active:
Define when the input should be active:
5.3.2.24
weekly
5.3.2.1
Function = Fieldbus:
5.3.3.1
Function = End of Batch
No:
Input is never active.
When closed
Input is active if the input relay is closed
When open:
Input is active if the input relay is open