![Swan Analytical Instruments AMI Codes-II O3 Operator'S Manual Download Page 21](http://html1.mh-extra.com/html/swan-analytical-instruments/ami-codes-ii-o3/ami-codes-ii-o3_operators-manual_1411369021.webp)
A-96.250.881 / 070622
AMI Codes-II O3
Installation
21
3.4. Installation of Flow Cell
CAUTION
Fragile Part
Handle the constant head tube with care.
To avoid damage during the transport, the constant head tube [C] of
the AMI Codes-II O3 is not installed.
To install the constant head tube proceed as follows:
1
Unpack the constant head tube [C].
2
Push the constant head tube into the flow cell block [E].
3
Put the constant head cover [A] onto the constant head tube.
4
Check if the overflow tube [B] is aligned with the upper Level
mark.
A
B
C
D
E
Constant head cover
Overflow tube
Constant head tube
Gasket
Flow cell block
Level
A
B
E
C
D