![SVP UDR-70 User Manual Download Page 135](http://html1.mh-extra.com/html/svp/udr-70/udr-70_user-manual_1410744135.webp)
126
UDR-70 H.265 Portable Receiver
USER’S MANUAL V1.0
8.3
Rack Unit Installation
The receiver must be well cooled and therefore, some space must be
left at the sides of the Receiver for ventilation purposes. This is
especially important when the unit is installed in a rack.
Before operation, the Receiver must me earthed to the rack chassis.
The Receiver incorporates a grounding point (M4 screw) on the left
side of the rear panel.
There are 3 fans on the Receiver, 2 air outputs and 1 air input.
Figure 96: Receiver grounding example
Summary of Contents for UDR-70
Page 1: ...UDR 70 Portable Receiver User Manual V1 0...
Page 2: ...Accessories included in this manual QPT Pan Tilt Positioner SCDA HAP 60...
Page 18: ...9 UDR 70 H 265 Portable Receiver USER S MANUAL V1 0 Chapter 3 How to Order...
Page 96: ...87 UDR 70 H 265 Portable Receiver USER S MANUAL V1 0 Figure 73 Google Earth example...
Page 159: ...150 UDR 70 H 265 Portable Receiver USER S MANUAL V1 0 B 3 Mechanical Drawings...
Page 161: ...152 UDR 70 H 265 Portable Receiver USER S MANUAL V1 0 Figure 108 Single link Configuration...
Page 179: ...170 UDR 70 H 265 Portable Receiver USER S MANUAL V1 0...
Page 180: ...171 UDR 70 H 265 Portable Receiver USER S MANUAL V1 0 Notes...