CHASSIS 5-19
REMOUNTING
Remount the handlebars in the reverse order of removal. Pay
special attention to the following points:
• When setting the handlebar clamp to the handlebar holder of
the steering upper bracket, face the punched mark
A
on its
clamp forward.
• Install the handlebars with the punch mark
B
aligned with the
handlebar clamp as shown.
• First, tighten the handlebar clamp bolts
1
to the half of speci-
fied torque, and then tighten the handlebar clamp bolts
1
and
2
to the specified torque.
'
Handlebar clamp bolt: 23 N·m (2.3 kgf-m)
• Apply grease to the throttle cables and assemble them to the
pulley.
%
99000-25010: SUZUKI SUPER GREASE “A”
• With the stopper
3
engaged with the handlebar hole, assem-
ble the handlebar switch.
• Install the brake master cylinder. (
#
5-17)
• Align the mating face of clutch lever holders with the punch
mark
C
and tighten the bolt.
• With the stopper
4
engaged with the handlebar hole, assem-
ble the left handlebar switch.
Front
Punch mark
Clearance
Summary of Contents for RV125
Page 1: ...9 9 5 0 0 3 1 2 3 3 0 1 E...
Page 34: ...PERIODIC MAINTENANCE 2 21...
Page 191: ...ELECTRICAL SYSTEM 6 23 SPEEDOMETER Disassemble the speedometer as follows...
Page 241: ...8 10 RV125K4 K5 04 05 MODELS REAR FENDER INSTALLATION 6 5 N m 0 65 kgf m...
Page 251: ...Printed in Japan K3 K4 K5 K6...