SERVICING INFORMATION 10-25
PAIR (AIR SUPPLY) SYSTEM HOSE ROUTING
1
PAIR control solenoid valve *2 The clamp end should face downward.
2
PAIR reed valve
*3 The clamp end should face left side.
ITEM
N·m
kgf-m lbf-ft
3
Air cleaner box
*4 The clamp end should face upward.
A
10
1.0
7.0
*1
White mark
*3
*2
*2
*4
MIN. 10 mm (0.4 in)
MIN. 10 mm (0.4 in)
*1