9.2.11
CHECK THAT MACHINE IS LEVELLED.
The machine has to be levelled using a water or laser leveller. The levelling is measured at the bottom
steel frame. Level cannot be established by placing a water leveller on top of the machine hood.
Machine must be levelled at bottom plate lengthways also making sure that the beams supporting
the wheels are parallel. The machine is levelled with the adjustable supports/feet turning them with
the adjusting nut. When the machine is levelled, lock the position of the supports/feet using the
locking nut (see above picture).
9.2.12
INSPECT BOTH FRONT AND BACK END OF THE CYLINDER, ADJUST ENDS IF NECESSARY.
The cylinder position is adjusted using fixed bolts for front gable end (10.) and bolts with springs (15.)
on the rear gable end.
1.
Cylinder
2.
First inspection hatch
3.
Second inspection hatch
4.
Front gable end
5.
Connection for fan
6.
Connection for infeed
7.
Temperature tube
8.
Sliding gasket
9.
Cylinder flange
10.
Fixed bolts for front gable
end
11.
Steel target on rotating
cylinder for inductive
sensor
12.
Inductive sensor
13.
Rear gable end
14.
Outlet pipe
15.
Springs for adjusting
bolts for cylinder
16.
Air inlet to cylinder
17.
Temperature probe in air
inlet