Model # 11
-
7800
Ceiling Rack
Parts List
Qty
Name
2
Ceiling Post
4
Arm
8
Lag Screw
8
Bolt
8
Washer
8
Lock Washer
8
Bolt Head Cover
Customer Service:770-518-0045
Fax: 770-518-8507
Website: www.suspenz.com
Suspenz®, Inc.
8725 Roswell Road #0-220
Atlanta GA 30350
Rev. 11/17
For Technical assistance or Replacement parts: call 866.787.7369
Holds up to 100 lbs per SUP/Kayak
Do not exceed 200 lbs total weight
Tools Needed :
Tape Measure, Stud Finder, Electric Drill, ¹/₄” Drill Bit,
¹/₁₆” drill bit, Adjustable Wrench, and a Bar of Soap
Scan* to see
Video Instructions
for Assembly & Use
Or
Visit Suspenz.com“
Video & Manual” page
*
QR code reader app required
Note: When determining Ceiling Rack placement, the base of the
Ceiling Post
must run parallel to the center of the ceiling joist;
however, the
Arms
may be positioned in any direction.
1 Kayak and 1 SUP
2 SUP’s
Important Safety Note:
It is critical that the 4 lag screws securing each Ceiling Post to the
ceiling are screwed into the center of a wooden joist. Screwing
Ceiling Posts into just dry wall or the edge of a joist is not suffi-
cient and could result in injury to self and damage to watercraft
or vehicle.
The length of your craft will determine the
Ceiling Post
spacing.
40% of total boat/board length,
(boat/board length X 0.4 = spacing).
1.
Use a Stud Finder to determine which way the ceiling joists
run in your ceiling.
2.
Hold horizontal part of
Ceiling Post
to the center of joist and
mark a hole location at one end.