2-1
Chapter 2: System Safety
Chapter 2
System Safety
2-1 Overview
This chapter provides a quick setup checklist to get your chassis up and running.
Following the steps in order given should enable you to have your chassis set up
and operational within a minimal amount of time. This quick set up assumes that you
are an experienced technician, familiar with common concepts and terminology.
2-2 Warnings and Precautions
You should inspect the box the chassis was shipped in and note if it was damaged
in any way. If the chassis itself shows damage, file a damage claim with carrier
who delivered your system.
Decide on a suitable location for the rack unit that will hold that chassis. It should
be situated in a clean, dust-free area that is well ventilated. Avoid areas where heat,
electrical noise and electromagnetic fields are generated.
You will also need it placed near at least one grounded power outlet. When con-
figured, the SC747 chassis includes a redundant power supply and require two
grounded outlets.
2-3 Preparing for Setup
The SC747 chassis includes a set of rail assemblies, including mounting brackets
and mounting screws you will need to install the systems into the rack. Please read
this manual in its entirety before you begin the installation procedure.
Summary of Contents for SC747TQ-R1400B
Page 1: ...SC747TQ R1400B USER S MANUAL 1 0 SC747 CHASSIS Series SUPER...
Page 8: ...SC747 Chassis Manual viii Notes...
Page 12: ...SC747 Chassis Manual 1 4 Notes...
Page 50: ...SC747 Chassis Manual 5 28 Notes...
Page 62: ...SC747 Chassis Manual 6 12 Notes...
Page 66: ...SC747 Chassis Manual A 4 Notes...
Page 68: ...SC747 Chassis Manual B 2 Notes...
Page 79: ...C 11 SAS 747TQ Backplane Specitications Notes...