
28
Chapter 2: System Installation
Note:
Figure is for illustrative purposes only. Always install servers to the bottom of a rack first.
Figure 2-10. Installing the System into the Rack
2.6 Installing the System into the Rack
With rails attached to both the chassis and the rack, install the server into the rack.
1. Pull the middle rail out of the outer rail and make sure the ball bearing shuttle is locked
at the front of the middle rail.
2. Align the chassis rails with the rack rails. Slide the chassis rails into the rack rails until
the server is completely in the rack (see the next page).