50
Chapter 3: Maintenance and Component Installation
Air Shroud
The system requires air shrouds for each node to maximize airflow efficiency.
Installing the Air Shroud
Before installing/removing the air shroud, please remove all riser card brackets first. Place
the air shroud as shown below.
Figure 3-13. Installing the Air Shroud