superbrightleds STN-1-RGB User Manual Download Page 1

Power 

Supply

Power 

Supply

Under Cabinet LED Flexible Light Strip Kit

Important: Read all instructions prior to installation.

STN-1-RGB

4400 Earth City Expy, St. Louis, MO 63045          

866-590-3533            superbrightleds.com

Rev Date: V1 05/04/2022

User Manual

Included Parts

Installation Process 

Safety and Notes

•  Product should be installed in accordance with applicable national, 

state, and local electrical codes. 

•  To reduce the risk of electric shock, ensure that the main power 

source is switched off and the power supply is disconnected 

 

before performing any installation or wiring procedures. 

• 

Product is for use in dry, indoor locations only. 

• 

Do not connect strip or controller directly to AC power. 

•  Do not connect components other than those included to the  

power supply.

• 

Ensure the polarity of all connections is correct during installation.

¹

¹UL certification only applies to the included strip and power supply 

1 - LED Strip 

1 - RGB Controller with Wireless RF Remote(MCBRF-RGB4)

1 - Power Supply (CPS-24V-48W)

1 - 10 ft Section of 4 Conductor 22 AWG Wire (RGB-4Wire)

4 - Quick Connect Terminal Blocks (LQC-2)

14 - Clamp-On Solderless Connectors (SBL-MA4P-10)

2 - Double-Sided Adhesive Foam Pads (3M-FTP)

Power 

Supply

Power 

Supply

Power 

Supply

Power 

Supply

Power 

Supply

Power 

Supply

Power 

Supply

Power 

Supply

Preinstall Check

Remove strip from reel and make connections to power supply 

and controller. Briefly turn on strip using controller power button 

to ensure proper operation of the strip, power supply, controller, 

and remote. After successful test, disconnect power supply and 

disconnect components.

Layout

Layout strip on counter below cabinets. Hold strips up under 

cabinets or measure to determine lengths of strip segments 

needed for installation. Cut strip to desired lengths ensuring all 

cuts are made only on marked cut lines.

Strip Installation

Attach solderless connectors (SBL-MA4P-10) to strip ends by 

placing the connector fully over the strip and pushing down cap 

until it locks in place. 

Next, ensure all installation surfaces are clean and dry. 

Begin to remove strip’s backing while adhering to bottom front 

edge of cabinets for optimal illumination. Press firmly to secure 

strips to surface. 

Route wire (RGB-4Wire) for strip-to-strip connections under 

cabinet seams, windows, and other spaces between cabinets. 

Cut wire to length and attach wire ends to solderless connectors 

by placing the wire fully into the connector and pushing the cap 

down until it locks in place. Ensure the wires are connected to 

the correct polarity on the strip.

Controller and Power Connection

Use the double-sided foam adhesive pads (3M-FTP) to mount 

the controller. Connect lead wires at the end of the strip run to 

the controller (MCBRF-RGB4) with terminal blocks (LQC-2). 

Connect the power supply (CPS-24V-48W) to the CPS 

connector and apply power to check for proper operation.

Reviews: