3.5. Connecting the PV 

 
The 3.6kW and 5.5kW models have only one MPPT controller with a maximum input current of 9Amp. 

 

The 8.8kW inverter has two built-in MPPT controllers, MPPT 1 and MPPT 2. Therefore, two individual 
arrays  can  be  connected  to  each  MPPT  for  better  performance.  The  maximum  current  of  the  array 
connected to each MPPT is 18Amp. 

 

 

Before connecting to PV modules, install a separate DC circuit breaker between the inverter and PV 
modules.  

 

 

To avoid any malfunction, do not connect any PV modules with possible current leakage to the inverter. 
For example, grounded PV modules will cause current leakage to the inverter. Open-circuit voltage 
(Voc) of PV modules does not exceed max. PV array open-circuit voltage open-circuit voltage (Voc) 
of PV modules should be higher than min. start voltage. 

 

8.8 kW PV Connection 

 

Summary of Contents for 3.6K-SG02LP1

Page 1: ...P1 SUNSYNK 5K SG03LP1 SUNSYNK 8K SG02LP1 SUNSYNK 7 6K SG02LP1 SUNSYNK 6K SG02LP1 SUNSYNK 5K SG02LP1 SUNSYNK 3 6K SG02LP1 Global Tech China Ltd 3 Floor Wai Yip Industrial Building 171 Wai Yip Street Kw...

Page 2: ...onitoring If an Earth Fault Alarm occurs the fault code F24 will be displayed on the inverter screen the LED indicator fault will light up All these models fall into two cabinet PCB types 5 5kW Small...

Page 3: ...E 24 4 4 STATUS PAGE 25 4 5 SYSTEM FLOW PAGE 26 4 6 SETUP PAGE 27 4 7 SET TIME CLOCK 27 4 8 SET COMPANY NAME BEEPER AUTO DIM 28 4 9 FACTORY RESET AND LOCK CODE 29 4 10 BATTERY SETUP HOME PAGE 29 4 11...

Page 4: ...IONING 52 5 1 STARTUP SHUTDOWN PROCEDURE 52 5 2 INFORMATION FOR COMMISSIONING INVERTER 53 5 3 GFDI FAULT 54 6 MAINTENANCE OF THE SYSTEM 54 APPENDIX A 55 APPENDIX B 56 APPENDIX C 56 APPENDIX D 56 APPEN...

Page 5: ...ctly grounded and the supply line must be equipped with a suitable breaker and RCD to protect people The unit is not explosion proof so it should not be installed in an explosive atmosphere Never touc...

Page 6: ...unction grid tied and off grid COMPATIBLE Compatible with main electrical grid voltages or power generators Compatible with wind turbines 220V single phase pure sinewave inverter Self consumption and...

Page 7: ...hort circuit protection Smart battery charger design for optimized battery protection Limiting function installed to prevent excess power overflow to grid APPLICATIONS Marine vessel power management P...

Page 8: ...grid 2 times of rated power 10 S AC Output Rated Current A 15 7A 21 7A Max AC Output Current A 18A 25A Max Continuous AC Passthrough A 35A Power Factor 0 8 leading to 0 8 lagging Output Frequency and...

Page 9: ...rt up Voltage V 150V PV Input Current A 11A 11A 18A 9A 18A 18A 18A 18A No of MPPT Trackers 2 No of Strings Per MPPT Tracker 1 1 2 1 2 2 2 2 AC Output Data Rated AC Output and UPS Power W 5000W 6000W 7...

Page 10: ...7 G98 G99 IEC61683 IEC62116 IEC61727 Safety Regulation IEC62109 1 IEC62109 2 EMC EN61000 6 1 EN61000 6 3 FCC 15 Class B General Data Operating Temperature Range 25 60 C 45 C Derating Cooling Fan Noise...

Page 11: ...eas that generates substances that adversely affect the equipment such as sulfuric gas chlorine gas acid or alkali It will cause the copper pipes and brazed joints to corrode which can cause refrigera...

Page 12: ...ive measures so that they cannot reach and touch the unit Install the indoor unit on the wall where the height from the floors is higher than 1600mm 3 2 Mounting the Inverter Select installation locat...

Page 13: ...r It is recommended to utilize a suitable fuse and DC isolator see next page In some applications switching devices may not be required but overcurrent protectors are still required A minimum battery...

Page 14: ...tting it up in the inverter 1 Connect a properly power cable following the battery manufacturer specification and recommend safety devices 2 Connect communication cable properly following the battery...

Page 15: ...tech china com 15 3 3 2 Battery Temperature Connection Without a remote temperature sensor lead acid batteries may undercharge or overcharge depending on the ambient temperature of the installation en...

Page 16: ...ies BMS Therefore you need to set the protocol of the BMS on both the battery and the inverter WHEN USING MORE THAN ONE BATTERY THE FIRST BATTERY WILL BE THE MASTER AND THE OTHER BATTERIES WILL BE THE...

Page 17: ...ions be sure to open DC protector or disconnector first 2 Remove insulation sleeve 10mm length unscrew the bolts insert the AC input wires according to polarities indicated on the terminal block and t...

Page 18: ...coil is one of the most important parts of the Sunsynk Parity inverter This device reduces the power of the inverter to prevent feeding power to the grid This feature is also known as Zero Export Fit...

Page 19: ...conductor fails All neutrals can be linked together to maintain the neutral bond When Neural Earth bond is required for off grid then it has to be removed on grid tied operation IMPORTANT If the CT co...

Page 20: ...this Sunsynk provides an AC output which is connected to the A T S connections whenever the inverter is running on Island Mode Therefore you can simply connect the coil of an AC relay to the ATS 240...

Page 21: ...he maximum current of the array connected to each MPPT is 18Amp Before connecting to PV modules install a separate DC circuit breaker between the inverter and PV modules To avoid any malfunction do no...

Page 22: ...te DC circuit breaker between the inverter and PV modules To avoid any malfunction do not connect any PV modules with possible current leakage to the inverter For example grounded PV modules will caus...

Page 23: ...l AC Green LED solid light Grid connection normal Normal Green LED solid light Inverter functioning normally Alarm Red LED solid light Fault Function Key Description Esc To exit the previous mode Up I...

Page 24: ...e to access the home page Daily readings Real time readings What this page displays Total daily power into the battery kWh Total daily power out of the battery kWh SOC State of charge of the battery T...

Page 25: ...iving from the grid the power is positive If the sign of the grid and HM powers are not the same when the PV is disconnected and the inverter is only taking energy from the grid and using the HM CT co...

Page 26: ...at the figure bellow 1 The PV modules charge the batteries 2 When the batteries reach a specific level programmable the battery power is fed into the inverter 3 The inverter can then supply power to t...

Page 27: ...i BMS press Li BMS 4 7 Set Time Clock To set time click on the Basic icon and then on Time How to set up step by step 1 Touch the screen on the variable that you want to change 2 Change the number up...

Page 28: ...own and then select ok This will change the name on the home screen How set the auto dim Set a number in the auto dim box to dim the LEO after a number of seconds How to activate deactivate the beep M...

Page 29: ...the Battery icon and then on Batt type What you can do from this page Use battery voltage for all settings V Use battery SOC for all settings What this page displays Reset status Whether lock code is...

Page 30: ...rid Charge signal to auto switch a relay box IMPORTANT TO PROTECT YOUR BATTERY AND INVERTER 200Ah AGM battery max charge discharge current 40Amps 400Ah AGM battery max charge discharge current 80Amps...

Page 31: ...ux input cannot be paralleled Also the inverter will extract what it needs from the grid supply to charge its batteries If you connect the generator to the Gen in part when there is a Gen signal the i...

Page 32: ...utdown is below 19V What this page displays Inverter shut down the voltage as a voltage or Inverter low battery warning voltage or Restart voltage as a voltage or What you can do from this page Adjust...

Page 33: ...nd held constant while the current is reduced to less than 1 of battery capacity This mode can be used to maintain a fully charged battery indefinitely Equalisation This is essentially a controlled ov...

Page 34: ...me battery manufacturers use others It is important to always refer to the documentation of the battery manufacturers when installing the battery Below there is a list of batteries that has been exami...

Page 35: ...0 Topakpower 48Vxxxx RS485 4 Hai Ying HY48050 CAN 0 Re Power LS4850 CAN 0 IMPORTANT When not using communications between battery and inverter never overcharge your battery bank concerning current an...

Page 36: ...ce the inverter to always take this amount of power from the grid to minimise nuisance Reverse Power Detection tripping of sensitive prepaid electricity meters 5 This controls the maximum overall powe...

Page 37: ...ct battery charging settings on the battery charge page as shown in Section 4 10 Battery Setup Home Page If Use Time is enabled then the inverter will use battery power according to your settings when...

Page 38: ...ommands from grid company and then adjust inverter output power The power output or input will vary in response to the AC grid voltage This function is switched off by default 1 Click Q V for Volt Var...

Page 39: ...Website www sunsynk com E mail sales globaltech china com 39 Voltage Trip and Ride Through L HVRT Frequency Trip and Ride Through L HFRT...

Page 40: ...leling Inverters To configure multi inverter settings click on the Advance icon What this page displays If the inverter operates as a master or a slave Modbus Device ID which must be unique for each i...

Page 41: ...with fuse isolators to each inverter Each invert will require a fuse isolator with surge protection and each group circuit will require an RCD If the batteries as supplying power to the main load duri...

Page 42: ...rs What is the sequence to install connect commission First of all leave the main supplies off Next connect all communication cables set up all LCDs and then finally turn on the main supplies What are...

Page 43: ...uences of setting A B or C phase wrong on the LCD It can damage the inverter Recommend checking the phase rotation with a meter before switching on What are the consequences of factory resetting power...

Page 44: ...or consumed Access this page by clicking on the Solar Turbine icon on the home page 4 19 Advanced Settings for Wind Turbine To configure wind turbine settings click on the Advance icon What this page...

Page 45: ...e solar module is still generating power a dump load will provide the electricity a path to flow This can be done using a switch on by the smart load option or utilizing a wind turbine controller with...

Page 46: ...or Voltage Battery level when the Aux load switches on Solar Power Power limiter to the maximum power allowed to the Aux load Gen Input Tick this box if using a Generator Aux Load Output Tick this bo...

Page 47: ...ak Shaving It is a technique used to reduce electrical power consumption during periods of maximum demand on the utility grid Thus one can save substantial amounts of money due to peaking charges What...

Page 48: ...he problem description including the fault code and indicator status displayed on the LCD is as detailed as possible 5 Your contact information Error Code Description Solutions F13 Working Mode Change...

Page 49: ...ge fault 1 Check if the voltage is in the range of standard voltage in specification this can be adjusted via the grid set up page 2 Check if grid cables are correctly connected F47 AC over frequency...

Page 50: ...erVolt_Fault F12 AC_SlaveContactor_Failure F44 AC_VW_UnderVolt_Fault F13 Working_Mode_change F45 AC_UV_OverVolt_Fault F14 DC_OverCurr_Failure F46 AC_UV_UnderVolt_Fault F15 AC_OverCurr_Failure F47 AC_O...

Page 51: ...unsynk com NOTE The energy storage inverter is designed according to the grid connected operation The inverters meets the safety and electromagnetic compatibility requirements as established in the ma...

Page 52: ...neer has completed the Earth Bond RCD and Earth Leakage Tests check the solar panel Voc voltage Must not exceed 480V and check the battery voltage Then the inverter can now be switched on Power on Seq...

Page 53: ...eck the battery charge and discharge is within the C rating of the battery Too high will damage the battery Check the battery BMS is communicating with the inverter This is the heart of the system thi...

Page 54: ...ill not connect to the grid and will report an error F24 on its LCD 6 Maintenance of the System The inverter is low maintenance however it is important that at least twice a year for dusty environment...

Page 55: ...Website www sunsynk com E mail sales globaltech china com 55 Appendix A...

Page 56: ...ation requirements of AS NZS3000 for the cable from the switchboard to the IES If an RCD is used the RCD shall 1 disconnect all live conductors including the actives and neutral and 2 be of the type s...

Page 57: ...Pty Ltd 166a King William Road HYDE PARK SA 5061 61 0 429 075 444 Website http www sunsynk com Contact leigh_horton pm me Manufacturer Sunsynk Limited Part of Global Tech 171 Wai Yip Street Kwun Tong...

Reviews: