background image

Fig 1

Fig 2

Fig 3

Fig4

Fig5

Fig 6

Fig 7

Fig8

Fig 9

Fig 10

Fig 11

ASSEMBLY INSTRUCTIONS 

Step 1: Place the base pedestal (A) and the large basin (B) on a level surface

bottom of the large basin (B).And then route the pump (C)’s power cord through the base pedestal (A), the cord exits 
through the slot in the bottom of base pedestal (A).(pls refer to the fig. 2)

Step 2: Route the pump (C)’s power cord downwards through the resin tube in large basin (B). Lay the pump (C) in the  

Lastly align the large basin (B) with base pedestal (A), insert the large basin (B) and twist clockwise to lock in place securely.

Step 3:Allign the second large pedestal(E) with the the large basin(B),make sure matching the slot under the second large 

Reviews: