85
ffiig
gu
urre
e 8
8--2
23
3 Battery Forced Charge Time
When there is no PV power, the power imported from the grid charges the energy sys-
tem during the time period until the target SOC is reached.
It is recommended to set the time period in off-peak tariff time. The time period 1 is in
priority to the time period 2 if two periods overlap. The charging energy comes from the
excess PV energy in priority and then from the grid. The inverter will take charging power
from the grid in the case of PV energy shortage.
8.10.10 Load Control
Tap S
Se
ettttiin
ng
gss→
→E
En
ne
errg
gyy M
Ma
an
na
ag
ge
em
me
en
ntt P
Pa
arra
am
me
ette
err→
→L
Lo
oa
ad
d C
Co
on
nttrro
oll to enter the corre-
sponding screen, on which you can set L
Lo
oa
ad
d C
Co
on
nttrro
oll M
Mo
od
de
e. Load Control Mode in-
cludes T
Tiim
miin
ng
g M
Mo
od
de
e, S
Sw
wiittc
ch
h M
Mo
od
de
e, and IIn
ntte
elllliig
ge
en
ntt M
Mo
od
de
e.
ffiig
gu
urre
e 8
8--2
24
4 Load Control
T
Tiim
miin
ng
g M
Mo
od
de
e
In this mode, set the L
Lo
oa
ad
d T
Tiim
miin
ng
g S
Stta
arrtt T
Tiim
me
e 1
1 and L
Lo
oa
ad
d T
Tiim
miin
ng
g E
En
nd
d T
Tiim
me
e 1
1, the sys-
tem will control the load operation during the interval. Take 09:00 am–09:30 am as an
example.
User Manual