After completion, anti-corrosion treatment should be done on the welding position.
5.3.3.2 Scheme 2: Fixing by Welding and Fastening
The overall diagram is shown in the following figure.
N
No
o..
N
Na
am
me
e
A
Pea gravel ground
B
Foundation
C*
Oil tray
Note: * is optional.
C
Co
on
nssttrru
uc
cttiin
ng
g tth
he
e F
Fo
ou
un
nd
da
attiio
on
n
It is recommended to construct the foundation as the following solution.
N
No
o..
N
Na
am
me
e
D
Embedded channel steel
E*
Cushion, included in the scope of supply
Note: * is optional.
F
Fiixxiin
ng
g tth
he
e M
MV
V S
Stta
attiio
on
n
The fixing point at the bottom of the MV Station (shown as A below).
The steps to fixing the L mounting parts is shown in the following figure.
System Manual