background image

Quick User Manual 

 

4 Electrical Connection 

  

15

 

4.3 

 

DC Connection 

4.3.1  PV mode configuration 

The two PV inputs can be configured in independent mode or parallel mode. Refer 
to the user manual for an appropriate mode selection. 

PV configuration mode can be performed by a switch on the configuration circuit 
board. 

 

y

 

For independence mode: turn the switch ON. 

y

 

For parallel mode: turn the switch OFF. 

When selecting parallel PV configuration mode, you should connect DC1+ to DC2+ 
and DC1- to DC2- on the DC connection circuit board by inserting jumper cables of 
cross-section not less than 6mm

2

 (10 AWG) as the following diagram shown. 

 

 

Summary of Contents for SG30KTL-M

Page 1: ...SG30KTL MV2 QUEN Ver22 201503 Version 2 2 Quick User Manual SG30KTL M PV Grid Connected Inverter...

Page 2: ......

Page 3: ...The contents of the manual will be periodically updated or revised due to the product development Specifications are subject to changes without advance notice The latest manual can be acquired via www...

Page 4: ...hereinafter unless otherwise specified To prevent personal injury or material damage the inverter must only be installed operated maintained and serviced by qualified personnel y They must be trained...

Page 5: ...nstallation position 10 3 2 Installation 12 4 Electrical Connection 13 4 1 Cable Requirements 13 4 2 AC Connection 14 4 3 DC Connection 15 4 3 1 PV mode configuration 15 4 3 2 DC Cable Connection Proc...

Page 6: ...IV 6 Technical Data 26 6 1 Technical Data 26...

Page 7: ...which if not avoided will result in death or serious injury WARNING indicates a hazard with a medium level of risk which if not avoided could result in death or serious injury CAUTION indicates a haz...

Page 8: ...1 3 Important Safety Instructions The inverter has been designed and tested strictly according to the international safety regulations As electrical and electronic equipment safety instructions relate...

Page 9: ...when exposed to sunlight and thus can create an electrical shock hazard y Wiring of the PV arrays should only be performed by qualified personnel All electrical connections must be in accordance with...

Page 10: ...you should obey the following procedures y Disconnect inverter from the utility grid side first and then PV arrays y Wait at least 10 minutes until the inner capacitors discharge completely y Verify...

Page 11: ...cause loss of any or all warranty rights There is a risk of inverter damage due to electrostatic discharge The printed circuit boards contain components sensitive to electrostatic discharge Wear a gr...

Page 12: ...m Item Description Note A PV strings Monocrystalline silicon polycrystalline silicon and thin film without grounding of protection class II B Inverter SG30KTL M C Metering device meter cupboard with p...

Page 13: ...ensure that the maximum power can be utilized even in different PV modules installation conditions Inversion circuit converts DC power into AC power which will be fed into the utility grid via five c...

Page 14: ...can detects positive fuse current 2 3 Unpacking and Detecting Unpack the carton and take out all the accessories Inspect the inverter for visible damages and check the completeness of the delivery con...

Page 15: ...CD and quick user manual E Expansion bolts Six units It is used for fastening backplate onto concrete wall F Fastener set Six units It is used for fastening backplate onto metal frame G Fix screws 2...

Page 16: ...tal frame y Mount the inverter at an appropriate site without flammable material and flammable gas nearby y Install the inverter vertically at eye level or tilted backwards by max 30 y The inverter un...

Page 17: ...ter to the sunlight or rain or snow directly y Take enough space for convection into consideration during installing multiple inverters It is suggested that position the multiple inverters in a stagge...

Page 18: ...person or the lifting device by means of the handles Always remember the weight of the inverters Grasp the equipment by both hands by means of handles Step 2 Fix the backplate on the wall with approp...

Page 19: ...t breaker until all inverter electrical connections have completed Do not open the enclosure when the inverter is under voltage There is a risk of inverter damage or personal injury 4 1 Cable Requirem...

Page 20: ...not allowed to connect loads between inverter and circuit breaker Connecting Inverter to AC Grid Danger to human life due to high voltage existing inside the inverter Make sure that all the DC and AC...

Page 21: ...ode selection PV configuration mode can be performed by a switch on the configuration circuit board y For independence mode turn the switch ON y For parallel mode turn the switch OFF When selecting pa...

Page 22: ...rical work Neither the DC positive pole nor the DC negative pole of the PV string is permitted to be grounded Step 1 Assemble the DC plug in connectors and disconnect the DC switch Step 2 Check the co...

Page 23: ...connection of a single string is prohibited A permanent failure of the system or inverter may follow if otherwise Step 3 Plug the positive and negative DC connectors into PV terminals underneath the...

Page 24: ...arts are not included in the delivery scope 4 5 Communication Connection There is a communication cable gland RS485 at the bottom of the inverter Configuration circuit board has two optional connectio...

Page 25: ...must be terminated with a resistor of 120 The shielding layer of RS485 cable should be single point grounded 4 5 2 RS485 Communication Connection RS485A B Bus Connection Step 1 Lead RS485 shielded twi...

Page 26: ...on Step 1 Lead Network cable through communication cable gland to the configuration circuit board Step 2 Use the Ethernet crimper to crimp the cables and connect cables to RJ45 plug according to TIA E...

Page 27: ...fter it is referred to as Press j Press more than two seconds Return to the previous menu or cancel the command Hereafter it is referred to as Press ESC Press less than two seconds Move left or right...

Page 28: ...installed where the country code is not included please choose item Other and manually set the protective parameters Step 5 If the country code set as TH a Grid codes page special for Thailand will a...

Page 29: ...tep 6 After completing the operation confirmed that the interface above if the country code set as IT AT or Other The Pro Stage interface will appear Press j to select Press ENTER to confirm the selec...

Page 30: ...rectly affects data logging Press h to move cursor and Press j to scroll up time value Confirm the settings by Pressing ENTER Step 11 After configuring all parameters there will be a Setting confirmat...

Page 31: ...If inverter s commissioning succeeds the RUN indicator will be lit and RUN will be displayed on the State area If inverter s commissioning fails the FAULT indicator will be lit and fault will occur o...

Page 32: ...DC1 DC2 66A 33A 33A Max input current for input connector 12A Short circuit current of PV input DC1 DC2 80A 40A 40A Output Side Data Nominal AC output power 30000W Max AC output apparent power 33120VA...

Page 33: ...rating ambient temperature range 25 60 45 derating Allowable relative humidity range 0 100 Cooling method Smart forced air cooling Max operating altitude 4000m 3000m derating Display Graphic LCD Commu...

Page 34: ...vance notice Sungrow Power Supply Co Ltd Add No 1699 Xiyou Rd New High Technology Industrial Development Zone 230088 Hefei P R China Post Zip 230088 Web www sungrowpower com E mail info sungrow cn Tel...