50
8.
Troubleshooting
Chapter 8 gives the basic troubleshooting methods.
8.1.
LED Indicated Fault Troubleshooting
Table 8-1 LED states during normal working
LED name
state
explanation
POWER
light
The power supply of the inner circuit is OK
OPERATION light
The inverter is in correct grid connection working state
FAULT
shut
No fault occurs
Table 8-2 LED fault and simple troubleshooting
LED state
explanation
No LED flashes
and
touch
screen
no
display
Disconnect the AC and DC voltage and keep disconnected for 5 min.
Afterwards, reconnect the DC voltage and then the AC voltage.
If the device does still not run it needs to be exchanged or repaired.
POWER shut
Power supply of the inverter is not working
,
First make sure that the grid is available and grid connection wires are
OK. Disconnect the AC and DC voltage and keep disconnected for 5
min. Afterwards, reconnect the DC voltage and then the AC voltage.
If the power LED never light after restart, please contact Sungrow.
Operation shut
The inverter is not in the grid connection state.
First check all the AC and DC wires are correctly connected.
Use multimeter to measure the DC input voltage and make sure the DC
input voltage exceeds the start threshold of the inverter operation.
Make sure the grid is available and parameters are within the inverter
specification. If all the conditions above are checked OK and this light
still not light, Please contact Sungrow.
FAULT light
A fault has occurred and is not solved.
Please refer to the touch screen fault message for the detailed fault
information and accordingly take troubleshooting. This LED will shut
when the fault disappears. Please contact Sungrow if this LED keeps
light all the time.
Summary of Contents for SG250K3
Page 1: ...SG250K3 Grid Connected Inverter Operation Manual SG250K3 3A E Ver21 200903 Version 2 1...
Page 2: ...Release History Version Release Date 2 1 Mar 2009 Author Approved By Chen Wei Zhao Wei...
Page 9: ...Safety Instructions Chapter 1 provides some important safety instructions about SG250K3...
Page 13: ...4 Introduction Chapter 2 provides basic information about SG250K3...
Page 18: ...9 Commissioning Chapter 3 describes the verification and commissioning of SG250K3...
Page 21: ...12 Operation Chapter 4 provides instructions about how to operate the SG250K3...
Page 38: ...29 5 History Events 6 History faults 7 History data...
Page 51: ...42 5 Input the limit data for the running parameter at the Set value column...
Page 53: ...44 5 Input the limit data for the protection parameter at the Set value column...
Page 62: ...53 Appendix...