Service Safety
Never work alone when servicing this equipment. Two persons are
required until the inverter is properly shut down, and verified de-
energized with a meter.
1.2.
Open the Door of SG250K3
Use the following procedure to shut down the SG250K3 Inverter before servicing:
1. Stop the inverter from the touch screen control menu.
2. Switch off the DC breaker (turn the switch to the “off” position) and press in
the 2 handles (near the DC breaker) to make it pop out from the lock hole at both
side doors, turn it right. Open the left door.
3. Switch off the AC breaker (turn the switch to the “off” position) and press in
the handle (near the AC breaker) to make it pop out from the lock hole and open
the right door.
Warning
:
Shock Hazard
The terminals of the SG250K3 PV input may have energy when the PV
arrays are energized.
After shut down, wait a minimum 5 minutes should be left for all
capacitors of SG250K3 to discharge and left with no potential
10 minutes
Summary of Contents for SG250K3
Page 1: ...SG250K3 Grid Connected Inverter Operation Manual SG250K3 3A E Ver21 200903 Version 2 1...
Page 2: ...Release History Version Release Date 2 1 Mar 2009 Author Approved By Chen Wei Zhao Wei...
Page 9: ...Safety Instructions Chapter 1 provides some important safety instructions about SG250K3...
Page 13: ...4 Introduction Chapter 2 provides basic information about SG250K3...
Page 18: ...9 Commissioning Chapter 3 describes the verification and commissioning of SG250K3...
Page 21: ...12 Operation Chapter 4 provides instructions about how to operate the SG250K3...
Page 38: ...29 5 History Events 6 History faults 7 History data...
Page 51: ...42 5 Input the limit data for the running parameter at the Set value column...
Page 53: ...44 5 Input the limit data for the protection parameter at the Set value column...
Page 62: ...53 Appendix...