19
In case of back-to-back installation, reserve specific clearance between the two inverters.
Install the inverter at an appropriate height for ease of viewing LED indicator and operating
switch(es).
4.3
Installation Tools
Installation tools include but are not limited to the following recommended ones. If necessary,
use other auxiliary tools on site.
table 4-1 Tool specification
Goggles
Earplugs
Dust mask
Protective gloves
Insulated shoes
Utility knife
Slotted screwdriver
(M2, M6)
Phillips screwdriver
(M4, M6, M8)
Hammer drill
(φ12, φ14)
Pliers
Marker
Level
User Manual
Summary of Contents for SG250HX-US
Page 2: ......
Page 6: ......
Page 10: ......