30
1:Heat shrink tubing
2:OT/DT terminal
Step 2
Remove the screw on the grounding terminal and fasten the cable with a screwdriver.
Step 3
Apply paint to the grounding terminal to ensure corrosion resistance.
-- -- E
En
nd
d
The grounding screws have been anchored to the side of the inverter before
delivery, and do not need to be prepared.
There are two grounding terminals. Use at least one of them to ground the
inverter.
5.5
Opening the Wiring Compartment
Step 1
Release two screws on the front cover of the wiring compartment with supplied Allen
wrench.
Step 2
Open the wiring compartment.
User Manual
Summary of Contents for SG250HX-IN-20
Page 2: ......
Page 6: ......
Page 10: ......
Page 65: ...55 E En nd d User Manual 5 Electrical Connection...