SG1K5TL
User Manual
34
Step 5:
Pull cables outwards to confirm whether they are installed firmly.
Step 6:
Tighten the cable gland in opposite direction.
If the recess on the front-end part of AC connector to match perfectly with the AC
terminal of the inverter, the connection of all AC cables is correct.
5.6.3
AC Wiring Procedure
Assignment of AC cables should be paid attention to, especially “GND” wire.
Step 1:
Assembling AC cables to connector supplied, see “5.6.2 Assembling AC
Cables to Connector”.
Step 2:
Make sure that AC and DC circuit breaker are disconnected.
Step 3:
Connect L and N to AC circuit breaker.
−
Plug AC connector to corresponding AC terminals.
−
Screw AC cables to AC circuit breaker.
Step 4:
Connect AC circuit breaker to utility grid.
Step 5:
Make sure that all AC cables are firmly installed.
Summary of Contents for SG1K5TL
Page 1: ......
Page 6: ...1 SAFETY AND PRODUCT INFORMATION For Installer and User...
Page 7: ...2...
Page 18: ...13 INSTALLATION AND MAINTENANCE INFORMATION Only for Installer...
Page 19: ...14...
Page 50: ...45 OPERATION INFORMATION For User and Installer...
Page 51: ...46...
Page 55: ...SG1K5TL User Manual 50 8 3 Overview of LCD Menu Fig 8 1 Menu Tree English...
Page 65: ...SG1K5TL User Manual 60...