step 5
Insert the terminal base into the corresponding terminal.
table 5-4
Terminal definition
N
No
o
D
De
effiin
niittiio
on
n
1
RS485 A+
2
RS485 A+
3
RS485 B-
4
RS485 B-
step 6
If other wiring operations need to be performed on the communication board, finish the
wiring operations before performing the following steps. If otherwise, continue to
perform the following steps.
step 7
Install the junction box, see
step 8
Pull the cable gently to make sure it is secured, tighten the swivel nut clockwise.
-- -- E
En
nd
d
5.10.4 Connection Procedure (RJ45 Ethernet Port)
step 1
Remove the communication junction box, see
step 2
Loosen the swivel nut of the junction box and select an appropriate seal according to
cable outer diameter. Lead the cable through the swivel nut, seal, and junction box
successively.
User Manual
Summary of Contents for SG125HX
Page 1: ...User Manual PV Grid Connected Inverter SG125HX SG125HX UEN Ver14 202105 WWW SUNGROWPOWER COM...
Page 2: ......
Page 6: ......
Page 10: ......
Page 32: ...22 E En nd d 4 Mechanical Mounting User Manual...