38
ffiig
gu
urre
e 5
5--4
4 PV Input Configuratinon
Prior to connecting the inverter to PV inputs, the specifications in the following table
should be met:
O
Op
pe
en
n--c
ciirrc
cu
uiitt V
Vo
olltta
ag
ge
e L
Liim
miitt
M
Ma
axx.. C
Cu
urrrre
en
ntt F
Fo
orr IIn
np
pu
utt C
Co
on
nn
ne
ec
ctto
orr
1500 V
30 A
5.7.2 Assembling the PV Connectors
High voltage may be present in the inverter!
•
Ensure all cables are voltage-free before performing electrical operations.
•
Do not connect the AC circuit breaker before finishing electrical connection.
SUNGROW provides corresponding PV connectors in the scope of delivery for
quick connection of PV inputs. To ensure IP66 protection, use only the
supplied connector or the connector with the same ingress of protection.
step 1
Strip the insulation from each DC cable by 7 mm–8 mm.
User Manual
Summary of Contents for SG125HX
Page 1: ...User Manual PV Grid Connected Inverter SG125HX SG125HX UEN Ver14 202105 WWW SUNGROWPOWER COM...
Page 2: ......
Page 6: ......
Page 10: ......
Page 32: ...22 E En nd d 4 Mechanical Mounting User Manual...