32
5.6.2 Requirements for OT/DT Terminal
OT/DT terminals (not included in the delivery scope) are required for fixing AC cables to
the terminal block. Purchase the OT/DT terminals according to the following
requirements.
O
OT
T//D
DT
T T
Te
errm
miin
na
allss o
off P
Ph
ha
asse
e W
Wiirre
e
•
Specification: M10;
•
Dimensions: a≤30mm / 10.5mm≤b≤11.5mm / c≤17mm
O
OT
T//D
DT
T T
Te
errm
miin
na
all o
off P
PE
E W
Wiirre
e
•
Specification: M10.
5.6.3 Connection Procedure
High voltage may be present in inverter!
Ensure all cables are voltage-free before electrical connection.
Do not connect the AC circuit breaker until all inverter electrical connections are
completed.
step 1
Disconnect the AC-side circuit breaker and prevent it from inadvertent reconnection.
step 2
Release two screws on the front cover of the wiring compartment with supplied Allen
wrench. Open the wiring compartment. Keep the wiring compartment opened during
wiring through the limit lever attached to the cover.
User Manual
Summary of Contents for SG125HX
Page 1: ...User Manual PV Grid Connected Inverter SG125HX SG125HX UEN Ver14 202105 WWW SUNGROWPOWER COM...
Page 2: ......
Page 6: ......
Page 10: ......
Page 32: ...22 E En nd d 4 Mechanical Mounting User Manual...