User Manual
84
Tab. 9-7
Explanation of communication parameters
Parameter
Setting Range
Device address
1-247
9.9.4 Operation Parameters
Click the
“
” to check the operation parameters and set the
related parameters as shown in the following figure.
The operation parameters include the active & reactive power parameters.
Fig. 9-15
Operation parameters
Active & reactive power parameters
Fig. 9-16
Active & reactive power parameters
Summary of Contents for SG125HV-30
Page 1: ...SG125HV 30 UEN Ver11 202003 Version 1 1 User Manual SG125HV 30 PV Grid connected Inverter...
Page 2: ......
Page 10: ......