
Chapter 4
Connecting Your Fibre Channel Array
4-7
FIGURE 4-4
Installed Cord Lock
10. Repeat this procedure for the second cord lock and second power cable.
4.4
Connecting the Chassis to DC Power
Outlets
Two DC power cords are packaged with each DC array. To connect the DC power
cords, perform the following procedure:
1. Connect a DC power cable to the first power supply and to a power outlet.
Note –
Use only the DC power cables provided with the array.
1
3
2
4
Summary of Contents for StorEdge 3000 Series
Page 14: ...xiv Sun StorEdge 3000 Family Installation Operation and Service Manual March 2004 ...
Page 18: ...xviii Sun StorEdge 3000 Family Installation Operation and Service Manual March 2004 ...
Page 38: ...1 12 Sun StorEdge 3000 Family Installation Operation and Service Manual March 2004 ...
Page 48: ...2 10 Sun StorEdge 3000 Family Installation Operation and Service Manual March 2004 ...
Page 54: ...3 6 Sun StorEdge 3000 Family Installation Operation and Service Manual March 2004 ...
Page 140: ...5 62 Sun StorEdge 3000 Family Installation Operation and Service Manual March 2004 ...
Page 180: ...7 32 Sun StorEdge 3000 Family Installation Operation and Service Manual March 2004 ...
Page 208: ...8 28 Sun StorEdge 3000 Family Installation Operation and Service Manual March 2004 ...
Page 242: ...B 28 Sun StorEdge 3000 Family Installation Operation and Service Manual March 2004 ...
Page 252: ...D 8 Sun StorEdge 3000 Family Installation Operation and Service Manual March 2004 ...
Page 270: ...G 12 Sun StorEdge 3000 Family Installation Operation and Service Manual March 2004 ...
Page 280: ...H 10 Sun StorEdge 3000 Family Installation Operation and Service Manual March 2004 ...
Page 312: ...K 10 Sun StorEdge 3000 Family Installation Operation and Service Manual March 2004 ...