198
Sun Fire 880 Server Owner’s Guide • August 2001
Reference for Agency Compliance
Specifications
The system complies with the following specifications.
Reference for Clearance and Service
Access Specifications
Minimum clearances needed for proper cooling are as follows.
Category
Relevant Standards
Safety
EN60950/IEC950 TUV
UL 1950, CB Scheme IEC 950, C22.2 No. 950 from UL
EK from KTL
RFI/EMI
Australia/New Zealand AS/NZ 3548 Class A
Industry Canada ICES-003 Class A
European Community EN55022 Class A
Japan VCCI Class A
Taiwan CNS 13438 Class A
US FCC 47CFR15.B Class A
Immunity
EN55024
EN61000-4-2
EN61000-4-3
EN61000-4-4
EN61000-4-5
EN61000-4-6
EN61000-4-8
EN61000-4-11
X-ray
US DHHS 21CFR Subchapter J
PTB German X-ray Decree
Blockage
Required Clearance
Front blockage only
3.0 in (7.6 cm)
Rear blockage only
3.5 in (8.9 cm)
Front and rear blockage
Front clearance
Rear clearance
3.5 in (8.9 cm)
4.0 in (10.2 cm)
Summary of Contents for Fire 880
Page 6: ...vi Sun Fire 880 Server Owner s Guide August 2001...
Page 8: ...viii Sun Fire 880 Server Owner s Guide August 2001...
Page 14: ...xiv Sun Fire 880 Server Owner s Guide August 2001...
Page 40: ...22 Sun Fire 880 Server Owner s Guide August 2001...
Page 106: ...88 Sun Fire 880 Server Owner s Guide August 2001...
Page 120: ...102 Sun Fire 880 Server Owner s Guide August 2001...
Page 176: ...158 Sun Fire 880 Server Owner s Guide August 2001...
Page 204: ...186 Sun Fire 880 Server Owner s Guide August 2001...
Page 212: ...194 Sun Fire 880 Server Owner s Guide August 2001...
Page 218: ...200 Sun Fire 880 Server Owner s Guide August 2001...