30
Cluster Platform 15K/9960 System Site Planning Guide • January 2002
❏
Do the pallet-jack fork dimensions meet requirements for the shipping crate? See
“Planning Your Access Route” on page 6.
❏
Are the elevator and elevator door dimensions adequate? See Chapter 2.
❏
Is the elevator weight capacity adequate? See Chapter 2.
❏
Does each ramp incline, in the access route, have an incline that is less than 10
degrees? Refer to the Sun Fire 15K System Unpacking Guide. This is less than a 12-
inch rise in ten feet.
❏
Has a crate unloading area next to the raised floor been identified?
❏
Have provisions been made to protect the raised floor along the delivery path?
❏
Is each door opening along the delivery path wide and tall enough to
accommodate the system?
Installation Schedule
❏
Has an installation date been determined? Date: _________________
❏
Who is the customer contact for shipment?
Name: _____________________________________________
Phone: ____________________________
Summary of Contents for 15K/9960
Page 4: ...Please Recycle...
Page 8: ...viii Cluster Platform 15K 9960 System Site Planning Guide January 2002...
Page 10: ...x Cluster Platform 15K 9960 System Site Planning Guide January 2002...
Page 12: ...xii Cluster Platform 15K 9960 System Site Planning Guide January 2002...
Page 14: ...xiv Cluster Platform 15K 9960 System Site Planning Guide January 2002...
Page 20: ...xx Cluster Platform 15K 9960 System Site Planning Guide January 2002...
Page 22: ...2 Cluster Platform 15K 9960 System Site Planning Guide January 2002...
Page 28: ...8 Cluster Platform 15K 9960 System Site Planning Guide January 2002...
Page 32: ...12 Cluster Platform 15K 9960 System Site Planning Guide January 2002...