background image

Notes: 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

TWO ZONE SURFACE UNIT 

INSTALLATION INSTRUCTION GUIDE

 

 

CABINET OPENING 

Prepare the cabinet accurately so your unit will fit properly.  Below are cabinet cutout 
dimensions.  The dimensions are for the unit to be mounted so the knobs are toward 
the front. 

 

 
 
 
 
 
 
 

CAUTION: 

To  eliminate  the  hazard  of  reaching  over  the  heated  surface  units,  cabinet  storage 
space located above the surface units should be avoided.  If cabinet storage is to be 
provided,  the  hazard  can  be  reduced  by  installing  a  range  hood  that  projects 
horizontally a minimum of 5 inches beyond the bottom of the cabinets. 
 

INSTALLATION: 

It  is  the  responsibility  of  your  installer  to  make  certain  that  your  range  is  properly 
installed.    Situations  caused  by  improper  installation  are  not  covered  under  the 
warranty.    Any  expenses  incurred  due  to  such  situations  will  not  be  paid  by  the 
manufacturer of the appliance. 
 

This unit is intended to be built-in to a cabinet structure only and 
is not intended for attachment to the building structure. 

 
 
 

CHECK LOCAL CODES 
BEFORE MAKING 
CONNECTIONS. 

“A”  :  2 

5

/

8

”   To Adjacent Vertical Combustible Surface 

          3 

1

/

4

”   To Opening for Adjacent Unit 

“B”  :  2 

7

/

16

”  Minimum to Front Edge of Counter Top 

“C”  :  2”        Minimum to Rear Edge or Rear Wall 
          (2 

7

/

16

” If Installed In Standard 24” Deep Counter Top) 

“D”  :  30”      Minimum Clearance To Bottom of Unprotected Wood Cabinet 

(24”    Minimum When Cabinet Bottom is Protected by Not Less Than 

1

/

4

” Millboard Covered By Not Less Than No. 28 MSG Sheet Steel, 

0.015” Stainless Steel, 0.024” Aluminum, or 0.020” Copper. 

Reviews: