background image

Installation and Operating Instructions

 

 

10002 Channel Series 

 

 

10002_Channel_Series_EN_20201208_V01.docx 

11 

8.  After a further 10 minutes of running, stop the machine, switch off and lock the main isolator. 

Check the tightness of all securing bolts. Re-check every 500 hours of operating time. 

9.  Check the tightness of all cables and connections. Re-check every 500 hours of operating time. 

10. 

Observe manufacturer’s guidelines with regard to gearbox lubricant initial renewal and 
subsequent intervals. 

11. In the event of machine overload (jam), the controller is programmed to activate the following 

procedure: 

i. 

Momentarily reverse rotation to clear the condition, then return to normal operation. 

ii. 

If overload re-occurs within 60 seconds, reverse rotation to clear the condition, then return 
to normal operation. 

iii. 

If a third overload occurs within 60 seconds of the first, machine shuts down and energises 
an alarm circuit. 

12. After machine shutdown, relieve pressure, isolate, and lock off. Inspect machine, remove any 

obstruction and reset the controller. 

13. The machine can now be re-started. 

 

Dismantling advice 

 

When servicing the grinder, be certain that the 
main isolator is tagged out / locked out. Serious 
injury could result from accidental start-up. 

1.  Disconnect wiring at motor(s) terminal box(es) and tag leads for identification. 

2.  Isolate the grinder from influent. 

3.  If necessary, the grinder may be completely removed from installation using the recommended 

lifting equipment. 

 

Cleaning / Inspection 

It is important to periodically inspect the grinder (timeframe dependent on usage). 

 

Attach lifting equipment and remove the grinder 

 

 

 

1.  Steam clean and disinfect all parts of the unit excluding motor, seal assemblies, 

gear drive unit and bearings. 

2.  Remove any gasket material from joint faces. 

3.  Housings should be cleaned thoroughly. 

4.  Inspect all parts for excessive wear. 

5.  Inspect gears for wear and damage. 

Summary of Contents for 10002 Channel Series

Page 1: ...10002_Channel_Series_EN_20201208_V01 docx 10002 Channel Series Installation and Operating Instructions www sulzer com EN ...

Page 2: ...ersoon die geautoriseerd is voor het op verzoek samenstellen van het technisch bestand SV Namn och adress på den person som är auktoriserad att på begäran utarbeta den tekniska dokumentsamlingen till myndigheterna NO Navn og adresse på den personen som har tillatelse til å sette sammen den tekniske file til myndighetene ved forespørsel DA Navn og adresse på den person der har tilladelse til at sam...

Page 3: ...tami normatywnymi HU Teljes felelősségünk tudatában kijelentjük hogy a termék amelyre a jelen kézikönyv és nyilatkozat vonatkozik megfelel az alábbi szabványoknak vagy egyéb normatív dokumentumoknak EL Δηλώνουμε με αποκλειστική μας ευθύνη ότι το προϊόν στο οποίο αναφέρεται το παρόν εγχειρίδιο και η δήλωση βρίσκεται σε συμμόρφωση με τα ακόλουθα πρότυπα ή άλλα κανονιστικά έγγραφα ET Kinnitame oma ai...

Page 4: ... 2004 108 ΕΚ οδηγία για την χαμηλή τάση 2014 35 ΕΕ οδηγία 2000 14 ΕΚ για το θόρυβο τροποποιήθηκε από το 2005 88 ΕΚ ET Kooskõlas ATEX direktiiviga 2014 34 EL masinadirektiiviga 2006 42 EÜ elektromagnetilise ühilduvuse direktiiviga 2004 108 EÜ madalpingedirektiiviga 2014 35 EL välismüra direktiiviga 2000 14 EÜ mida on muudetud direktiiviga 2005 88 EÜ CS Podle definice ve směrnici ATEX 2014 34 EU smě...

Page 5: ...ion of use 5 Torque settings 6 Safety recommendations 6 Noise levels 6 Lubrication 6 Handling 7 Use of items not approved or manufactured by Sulzer 7 Inspection Storage 7 Installation 8 Earth bonding explosion proof grinders only 9 Electrical installation 9 Guards 10 Warning Control device 10 Start up procedure 10 Dismantling advice 11 Cleaning Inspection 11 Re assembly advice 12 Extended shutdown...

Page 6: ...y result in sparking due to unintended mechanical contact or temperature rises due to mechanical or electrical overload 6 Failure to operate or maintain the grinder and ancillary equipment in line with the manufacturer s instructions may lead to premature and potentially dangerous failure of components Regular inspection and where necessary replacement of bearings seals other wearing parts and lub...

Page 7: ...e details II Equipment Group Surface 2 3 ATEX Category High Protection G D Gas Dust Ex Explosion Proof h Mechanical Equipment assigned protection group per EN80079 36 IIB IIIC Gas Dust Group T Temperature Class Gb Dc Equipment Protection Level Gas 1 Dust 22 Channel Monster Gas Only Non ATEX Muffin Monster Gas Dust ...

Page 8: ...tating components may occur after power loss if the main isolator is not off Suspended load Do not stand under the grinder during installation removal Wear safety shoes when handling components Sharp edges Wear safety gloves when handling grinder cutters and spacers Wear eye protection when cleaning components The grinder must rotate in the correct direction for proper operation This must be check...

Page 9: ...55 2 2 kW IP55 1 5 kW IP55 2 2 kW IP55 4 0 kW IP68 1 5 kW IP68 2 2 kW IP68 4 0 kW 29 kg 46 kg 15 kg 31 kg 31 kg 31 kg 36 kg 38 kg Motor Only IP55 1 5 kW IP55 2 2 kW IP55 4 0 kW IP68 1 5 kW IP68 2 2 kW IP68 4 0 kW 22 kg 32 kg 44 kg 46 kg 84 kg 159 kg Intended use The 10002 open channel series grinder has been designed for the economical and reliable particle reduction for commercial industrial and ...

Page 10: ...ons and guidelines discipline specific apprenticeship training Special physical requirements N A Personnel affected Installers electricians operators maintenance personnel Environmental limits Temperature Operation 5 C to 40 C Storage 40 C to 65 C Humidity IP68 Elevation 1000 metres above sea level Space limits Clearance required for operation 150mm over motor fan cover 914mm in front of controlle...

Page 11: ...factory operation of the grinder is achieved When handling harmful or objectional materials adequate ventilation must be provided in order to disperse dangerous concentrations of vapours It is recommended that where possible Sulzer grinders should be installed with provision for adequate lighting thus ensure that effective maintenance can be carried out in satisfactory conditions With certain prod...

Page 12: ... items that are not approved by or manufactured by Sulzer may affect the safe operation of the grinder and it may therefore become a safety hazard to both operators and other equipment In these instances the declaration provided will therefore become invalid The guarantee referenced in the Terms and Conditions of Sale will also be invalidated if replacement items are used that are not approved or ...

Page 13: ... Sulzer colour RAL 5002 Installation Electrical mechanical and maintenance work should only be performed by suitably qualified and competent persons and must be in accordance with relevant electrical and mechanical regulations Fill any gaps between the frame and channel wall Be sure to use both lifting eyes Flow Attach 3 phase motor power and any optional thermostat wiring ...

Page 14: ... to the correct operating philosophy Only PLCs supplied or approved by Sulzer should be used Failure to observe this requirement may cause premature machine failure and could invalidate the warranty of the machine It is also important that the PLC be correctly wired into the panel refer to the Controller Manual if controller is supplied Before installing the grinder please ensure that all plugs an...

Page 15: ... or materials near the grinder Use a control panel rated for the grinder motor voltage amps frequency with a suitable power disconnect and overtemp protection if the motor has a thermostat Apply power to grinder with the control panel control switch Check for proper motor or shaft rotation Disconnect power and interchange any two motor leads if reversed Gradually apply flow Verify reduction of sol...

Page 16: ...seconds of the first machine shuts down and energises an alarm circuit 12 After machine shutdown relieve pressure isolate and lock off Inspect machine remove any obstruction and reset the controller 13 The machine can now be re started Dismantling advice When servicing the grinder be certain that the main isolator is tagged out locked out Serious injury could result from accidental start up 1 Disc...

Page 17: ...he Inspection Storage section Maintenance For service or parts please contact your Sulzer representative DO NOT attempt service other than that described in this section Remove and lock out supply power After first 3 months then every 6 months or if solids not processed Check cutters for wear edges should not be rounded See Allowable wear tolerances Check cutter stack tightness If loose or worn re...

Page 18: ...Complex EP2 O Ring grease Ironsides Lubricant Ltd Silicon valve grease 0250 0077 Rust inhibitor Solent SOL 732 0620K spray General and protectant WD 40 Company WD 40 aerosol lubricant O E M Original Equipment Manufacturer Allowable wear tolerances Description O D Thickness Spacer Maximal 0 20 mm zero wear Cutter Maximal 0 63 mm 0 75mm per side at edge of cutter See Cutter Wear figure below Cutter ...

Page 19: ...t reduced Cutter rotation Cutters for wear Cutter stack tightness Grinder motor drive train Loose cutter stack The unit must be stripped down Seal cartridges for damage Cutters for wear Lock nuts loose Excessive noise vibration or reversals Drive gears for wear Seal cartridges for contamination Motor overload Solids overloading Cutters for wear ...

Page 20: ...10002_Channel_Series_EN_20201208_V01 docx JWC Environmental Unit 15 Daneside Business Park River Dane Road Congleton Cheshire CW12 1UN United Kingdom www sulzer com ...

Reviews: