Section 3
SPECIFICATIONS
17
3.2 LUBRICATION GUIDE-STANDARD COMPRES-
SORS
for fluid fill port location. Sullair
standard compressors are filled with Sullube fluid
as factory fill.
Sullube fluid should be changed every 1200 hours
or once a year, whichever comes first. The fluid
should be changed more frequently under severe
operating conditions, such as high ambient temper-
atures coupled with high humidity, or when high
COMPRESSOR:
Type:
2-Stage Oil Flooded Rotary
Maximum Full Load Operating Pressure:
350 psig (24.1 bar)
Bearing Type:
Anti-Friction
Cooling:
Pressurized Compressor Fluid
Lubricant:
Sullube
Sump Capacity:
50 U.S. Gallons (189.3 Liters)
Control:
Supervisor Controller
MOTOR:
Type:
O.D.P., 460V, A.C., Three Phase, 60 Cycles
Size:
300, 350, 400, 450, 500, 600HP
Speed:
1800 RPM
Figure 3-1 Fluid Fill Port Location
To be sure that you receive the correct fluid for
your compressor, when ordering fluid, always
confirm your compressor’s fluid fill with the parts
technician by using your compressor’s serial
number.
Mixing of other fluids within the compressor will
void all warranties.
3.1 SPECIFICATIONS- LS20TS
Model Series
DIMENSIONS WITHOUT ENCLOSURE (I)
Length
Width
Height
Weight
in
mm
in
mm
in
mm
lb
kg
LS20T 800 CFM
157
3988
72
1821
92
2339
(II)
(II)
LS20T 960 CFM
157
3988
72
1821
92
2339
(II)
(II)
LS20T 1100 CFM
157
3988
72
1821
92
2339
(II)
(II)
LS20T 1450 CFM
157
3988
72
1821
92
2339
(II)
(II)
(I)
Add an additional mm to Height for enclosed models. Add an additional mm to height for air inlet cap.
(II)
Add kg for enclosed models.
For noise level information, please contact the Sullair Factory Service Department.
When performing a fluid
change or topping off the
fill, the proper level should
be at half of the sight glass,
with the machine off.
KEY
A
FLUID FILL PORT
B
SIGHT GLASS
C
SUMP/SEPARATOR
TANK
Summary of Contents for LS20T 1100 CFM
Page 18: ...Section 2 DESCRIPTION 12 Figure 2 3B Control System Diagram START...
Page 19: ...Section 2 DESCRIPTION 13 Figure 2 3C Control System Diagram MODULATION...
Page 20: ...Section 2 DESCRIPTION 14 Figure 2 3D Control System Diagram FULL LOAD...
Page 21: ...Section 2 DESCRIPTION 15 Figure 2 3E Control System Diagram UNLOAD...
Page 44: ...NOTES 38...
Page 104: ...Section 9 ILLUSTRATIONS AND PARTS LIST 98 02250146 367R00 9 19 CONTROL START SYSTEM...
Page 106: ...Section 9 ILLUSTRATIONS AND PARTS LIST 100 02250146 367R00 9 19 CONTROL START SYSTEM...
Page 108: ...Section 9 ILLUSTRATIONS AND PARTS LIST 102 02250138 633R00 9 20 CONTROL PANEL...
Page 110: ...Section 9 ILLUSTRATIONS AND PARTS LIST 104 02250139 119R01 9 21 ENCLOSURE...
Page 112: ...Section 9 ILLUSTRATIONS AND PARTS LIST 106 02250139 119R01 9 21 ENCLOSURE...
Page 114: ...Section 9 ILLUSTRATIONS AND PARTS LIST 108 9 22 DECAL GROUP...
Page 116: ...Section 9 ILLUSTRATIONS AND PARTS LIST 110 9 22 DECAL GROUP...
Page 118: ...Section 9 ILLUSTRATIONS AND PARTS LIST 112 9 22 DECAL GROUP...
Page 120: ...Section 9 ILLUSTRATIONS AND PARTS LIST 114 9 23 DECAL LOCATIONS OPEN AIR COOLED...
Page 122: ...Section 9 ILLUSTRATIONS AND PARTS LIST 116 9 24 DECAL LOCATIONS OPEN WATER COOLED...
Page 124: ...Section 9 ILLUSTRATIONS AND PARTS LIST 118 9 25 DECAL LOCATIONS REMOTE COOLER...
Page 126: ...Section 9 ILLUSTRATIONS AND PARTS LIST 120 9 26 DECAL LOCATIONS CONTROL BOX...
Page 128: ...Section 9 ILLUSTRATIONS AND PARTS LIST 122 9 27 ENCLOSURE DECALS...
Page 145: ...NOTES 139...