![Suez Sievers UPW Boron Analyzer Operation And Maintenance Manual Download Page 89](http://html1.mh-extra.com/html/suez/sievers-upw-boron-analyzer/sievers-upw-boron-analyzer_operation-and-maintenance-manual_1389722089.webp)
SUEZ © 2018
DLM 71000-03 EN
Rev. B
Chapter 8: Maintenance
Figure 13: Fluidics Diagram
John Guest
®
(JG)
This type of fitting is used only with rigid plastic tubing. Usually no tools are required to make or break
connections.
To make a connection, insert the tubing end into the fitting and push firmly into place. The tubing must have
a clean square cut-off and not have any scratches in the first 1/2-inch section. An O-ring seals the fitting
body to the OD of the tubing, so make sure the outside surface of the tubing is in good condition. Reusing
the same tube in a fitting may require re-cutting the tubing to remove fitting-induced scratches.
To disconnect, push the collet toward the fitting (if necessary, use a 3/8-inch wrench to push the collet) and
then pull the tubing out. Collets and O-rings can easily be replaced when necessary. JG fittings used to
drain the Analyzer are 3/8-inch OD.; all others are 1/4-inch OD. Fittings work best when no stress is
applied to the tubing after assembly.
Summary of Contents for Sievers UPW Boron Analyzer
Page 4: ...SUEZ 2018 4 of 104 DLM 71000 03 EN Rev B THIS PAGE IS INTENTIONALLY LEFT BLANK...
Page 16: ...SUEZ 2018 16 of 104 DLM 71000 03 EN Rev B THIS PAGE IS INTENTIONALLY LEFT BLANK...
Page 103: ...Notes SUEZ 2018 103 of 104 DLM 71000 03 EN Rev B 104...
Page 104: ...Notes SUEZ 2018 104 of 104 DLM 71000 03 EN Rev B 104...