7
FurnaCE rEMOVal
SF-20/25/30/35/42, SF-20Q/25Q/30Q/35Q/42Q, SFV-20/25/30/35/42,
SH-35/42
and SHD-2542
1.
Remove the vent cap assembly from the outside access door by removing applicable screws, also the four (4)
screws retaining the door to the frame. Remove the door to gain access to the furnace.
2.
Turn off gas and power, then disconnect gas and power supply at the furnace. Label wires as necessary.
3.
Remove the (1) one tie down screw securing the chamber to the cabinet.
4.
Remove the furnace from the cabinet by pulling chamber outward completely to gain access to all controls and
applicable parts.
5.
To re-install, reverse this procedure.
6.
Rewire applicable wires and perform a leak test on all fittings. Perform a drop pressure test.
SF-20/25/30/35/42F, SF-20FQ/25FQ/30FQ/35FQ/42FQ,
SFV-20/25/30/35/42F and SH-35/42F
1.
Turn off gas and power, then disconnect gas and power supply at the furnace. Label wires as necessary.
2.
Remove the vent cap assembly by removing applicable screws.
3.
Remove the cabinet front two (2) screws.
4.
Remove the (1) one tie down screw securing the chamber to the cabinet.
5.
Remove the furnace from the cabinet by pulling chamber outward completely to gain access to all controls and
applicable parts.
6.
To re-install, reverse this procedure.
7.
Rewire applicable wires and perform a leak test on all fittings. Perform a drop pressure test.
NOTE: ON SFV MODELS, REMOVE EXTRA SCREWS FOR CHAMBER REMOVAL.
P-30S and P-40
1.
Turn off gas and power, then disconnect gas and power supply at the furnace. Label wires as necessary.
2.
Remove the vent cap assembly by removing applicable screws and one (1) flue retaining screw. (Not applicable
to P40.)
3.
Remove the cabinet front two (2) screws.
4.
Remove the (2) two tie down screw securing the chamber to the cabinet.
5.
Remove the furnace from the cabinet by pulling chamber outward completely to gain access to all controls and
applicable parts.
6.
To re-install, reverse this procedure.
7.
Rewire applicable wires and perform a leak test on all fittings. Perform a drop pressure test.