background image

16

Figure 12

NT 24/30/34SP • P30S

2 3/4" DIA. TWO HOLES.

INTAKE TUBE

MAXIMUM WALL THICKNESS

FOR THIS UNIT IS 2 1/4"

SEE FIGURE 4 IF MORE THAN

2 1/4" WALL THICKNESS.

ANCHOR VENT ASSEMBLY 

WITH THE SCREW PROVIDED. 

BE SURE SCREW ENGAGES 

FURNACE EXHAUST TUBE 

AND IS PULLED SECURE.

CAULK BEHIND VENT CAP AS SHOWN TO 

SEAL BETWEEN EXHAUST AND INTAKE 

AND TO PREVENT MOISTURE INSIDE 

FURNACE COMPARTMENT. APPLY 

CAULKING GENEROUSLY AROUND 

PERIMETER OF VENT CAP AND ACROSS 

CENTER AS SHOWN. CENTER PUTTY 

STRIP IS ESSENTIAL.

Figure 13

NT 24/30/34SP • P30

EXTENSION TUBE 

KIT NUMBER

MIN./MAX. LENGTH

(Extension Tube Range)

520498

2 1/4” to 3 1/8”

520499

3 1/8” to 4 7/8”

520500

4 7/8” to 7”

520501

7” to 9”

EXTENSION TUBE 

KIT NUMBER

MIN./MAX. LENGTH

(Extension Tube Range)

520593

2 1/4” to 3 1/8”

520594

3 1/8” to 4 7/8”

520595

4 7/8” to 7”

520596

7” to 9”

Figure 15

NT 40 • P40

Figure 14

NT 24/30/34SP • P30

*3 1/2" FROM CENTER LINE

OF INTAKE TO CENTER LINE

OF EXHAUST

** 7 1/2" FROM CENTER LINE

OF INTAKE TO FLOOR

GASKET: PEEL OFF PROTECTIVE PAPER

TO EXPOSE THE ADHESIVE SURFACE. 

ATTACH GASKET TO WASHER. PLACE

WASHER OVER GAS FITTING. THE

GASKET SHOULD SEAL AGAINST CABINET

WHEN GAS FITTING IS THREADED

INTO POSITION.

MAXIMUM WALL THICKNESS 3"

NOTE: 0" CLEARANCE PERMISSIBLE

AT REAR OF FURNACE FOR A WIDTH

OF 3" MAXIMUM

3 1/2

TWO 2 1/4" DIA HOLES

* *

*

7 1/2

2 3/4

13

6 7/32

12 7/16

VENT CAP

EXHAUST

AIR INTAKE

THE SCREW PROVIDED

MUST BE USED ON ALL

INSTALLATIONS

INSIDE WALL

OUTSIDE SKIN

FLOOR

ANCHOR TO FLOOR

 

WASHER

GAS FITTING

FURNANCE

VEnT aSSEMblY inSTallaTiOn (nT SEriES)

Summary of Contents for SFV-25

Page 1: ...Suburban R V F URNA C E Service TRAINING Manual...

Page 2: ...12 VDC 520820 Fan Control Module Board 26 Sequence of Operation 24 VAC 520947 Fan Control Module Board 27 Sequence of Operation SHD 2542 Furnace 28 Sequence of Operation Time Delay Relay Equipped Fur...

Page 3: ...erates on 120 volts AC These are designed and tested under the same standards as the 12 volt models Suburban forced draft combustion furnaces used in recreational vehicles are designed for use with Pr...

Page 4: ...ved from the furnace 3 Never use a screwdriver on any part of the electrode assembly while the furnace is in operation 4 Be certain that the spark from the electrode never reaches the flame sensor por...

Page 5: ...1 2 17 20 Electronic 35 SF 42Q 42FQ 40 000 7 1 2 17 20 Electronic 35 SH 35Q 35FQ 35 000 9 1 4 17 20 Electronic 40 SH 42Q 42FQ 40 000 9 1 4 17 20 Electronic 42 Accessories Description 6258ACW DOOR Opt...

Page 6: ...all controls and applicable parts 6 To re install reverse this procedure 7 Rewire applicable wires and perform a leak test on all fittings Perform a drop pressure test NT 12 16 20SE 1 Turn off gas and...

Page 7: ...essary 2 Remove the vent cap assembly by removing applicable screws 3 Remove the cabinet front two 2 screws 4 Remove the 1 one tie down screw securing the chamber to the cabinet 5 Remove the furnace f...

Page 8: ...furnace installation manual for all installation requirements Location and Installation Locate the furnace near lengthwise center of the coach Choose a location for installation out of the way of wire...

Page 9: ...P AND ACROSS CENTER AS SHOWN CENTER PUTTY STRIP IS ESSENTIAL OUTSIDE SKIN PANEL TUBE INTAKE AIR WITH GASKET VENT CAP AND EXHAUST DETAIL A 2 MAXIMUM WALL THICKNESS TUBE AIR INTAKE WITH GASKET VENT CAP...

Page 10: ...INSIDE FURNACE COMPARTMENT APPLY CAULKING GENEROUSLY AROUND PERIMETER OF VENT CAP AND ACROSS CENTER AS SHOWN CENTER PUTTY STRIP IS ESSENTIAL 2 M A X C L 9 7 64 1832 7 10 1 32 FURNACE TIE DOWN SCREW FU...

Page 11: ...DERED SEPARATELY EXTENSION KITS COME WITH COMPLETE INSTALLATION INSTRUCTIONS 1 Figure 4A SH Models VENT ASSEMBLY INSTALLATION SF 20F SF 25F SF 30F SF 35F SF 42F STANDARD VENT INSTALLATION X INTAKE 1 2...

Page 12: ...MUST BE NOTCHED AS SHOWN BELOW 220 MIN HEIGHT WIDTH DETAIL A ONE PER SIDE CABINET MOUNTING L C 375 2 062 220 MIN 2 060 8 281 CUTOUT AS VIEWED FROM OUTSIDE R V CUTOUT FOR FURNACE ACCESS DOOR FRAME FLO...

Page 13: ...URE WITH 6 SCREWS REMOVABLE PANEL OF COACH WALL MUST SEAL WATER TIGHT WITH GASKET C L L CFURNACE CUTOUT ANCHOR FURNACE TO FLOOR USING THE 4 10 X 3 4 SCREWS PROVIDED 2 2 250 DIA HOLES 2 000 MAX WALL TU...

Page 14: ...ENT CAP AND ACROSS CENTER AS SHOWN CENTER PUTTY STRIP IS ESSENTIAL IMPORTANT VENT CAP AND TUBE ASSY MUST BE INSTALLED FROM OUTSIDE OF COACH VENT ASSEMBLY INSTALLATION NT SERIES VENT TUBE INSTALLATION...

Page 15: ...12 1 1 4 MIN OVERLAP 3 8 X 27 1 4 TO 29 1 2 22 3 4 TO 25 25 TO 27 1 4 TRAILOR SKIN 2 1 4 VENT CAP 1 2 MIN OVERLAP DIA 2 1 4 Y 7 1 2 DIA VENT TUBE INSTALLATION NT 20S VENT TUBE ASSY INTAKE SEE CHART MO...

Page 16: ...20501 7 to 9 EXTENSION TUBE KIT NUMBER MIN MAX LENGTH Extension Tube Range 520593 2 1 4 to 3 1 8 520594 3 1 8 to 4 7 8 520595 4 7 8 to 7 520596 7 to 9 Figure 15 NT 40 P40 Figure 14 NT 24 30 34SP P30 3...

Page 17: ...WALL THICKNESS 2 25 NOTE 0 CLEARANCE PERMISSIBLE AT REAR OF FURNACE FOR A WIDTH OF 2 25 MAXIMUM VENT CAP Figure 17 P40 VENT ASSEMBLY INSTALLATION NT40 P40 3 1 2 7 1 2 2 3 4 13 6 7 32 12 7 16 FLOOR 1...

Page 18: ...NOT REMOVE COLLAR VENT CAP CENTERLINE OF FURNACE INSTALLATION 3 DIA 2 HOLES OUTER SKIN 3 1 2 X 7 CUTOUT THRU COMBUSTIBLE CONSTRUCTION CAULK BEHIND VENT CAP AS SHOWN TO SEAL BETWEEN EXHAUST AND INTAKE...

Page 19: ...THE FURNACE MUST NOT BE LESS THAN THE MINIMUM SPECIFIED SPACER BUMPS FURNACE Figure 20 SF 20F 25F 35F 42F DUCTING Suburban furnaces require that a minimum duct area be maintained throughout entire du...

Page 20: ...L R SIDE DUCT SQ INCH RETURN AIR SQ INCH DD 17DSI SEE 1 0 0 0 0 0 N A N A N A N A N A NT 12S 3 8 1 0 0 1 1 2 4 N A N A 25 55 NT 16S 3 8 1 0 0 1 1 2 4 N A N A 25 55 NT 20S 1 1 0 0 1 1 2 4 N A N A 25 5...

Page 21: ...REQ D BTM DUCT SQ INCH TOP DUCT SQ INCH L R SIDE DUCT SQ INCH RETURN AIR SQ INCH SF 20 20F 1 0 0 0 0 0 2 4 56 56 25 55 SF 20Q 20FQ 1 0 0 0 0 0 2 4 56 56 25 55 SF 25 25F 1 0 0 0 0 0 3 4 56 56 36 55 SF...

Page 22: ...BACK CLR LEFT CLR RIGHT DUCTS REQ D BTM DUCT SQ INCH TOP DUCT SQ INCH L R SIDE DUCT SQ INCH RETURN AIR SQ INCH SFV 20 20F 1 1 0 0 1 1 SEE 4 52 SEE 4 SEE 4 55 SFV 25 25F 1 1 0 0 1 1 SEE 4 52 SEE 4 SEE...

Page 23: ...any of the original wire that is supplied with the appliance must be replaced it must be replaced with type 105 C or its equivalent Power supply connections are to be on the right side of the furnace...

Page 24: ...ucted 16 000 PROPANE 12 VDC 3 2 8 1 WC 165 NT 20S Ducted 19 000 PROPANE 12 VDC 3 2 8 1 WC 165 NT 12SE Direct Discharge 12 000 PROPANE 12 VDC 3 2 8 N A 140 NT 16SE Direct Discharge 16 000 PROPANE 12 VD...

Page 25: ...3 7 0 3 IN MOTOR 2 WC 300 SF35 35F Ducted 35 000 PROPANE 12 VDC 3 8 5 2 5 IN MOTOR 9 4 3 IN 2 WC 375 SF35Q 35FQ Ducted 35 000 PROPANE 12 VDC 3 8 4 3 IN MOTOR 2 WC 375 SF 42 42F Ducted 40 000 PROPANE...

Page 26: ...module board will then check for flame sense to verify successful lighting of the main burner flame Sparking of the igniter will then be terminated and the gas valve and blower outputs will remain en...

Page 27: ...seconds of ignition time The module board will then check for flame sense to verify successful lighting of the main burner flame Sparking of the igniter will then be terminated and the gas valve and b...

Page 28: ...ame sense to verify successful lighting of the main burner flame Sparking of the igniter will then be terminated and the gas valve and blower outputs will remain energized If ignition is successful th...

Page 29: ...em as power is applied to the DSI Board The system will do the following 1 The board has a timing circuit which allows the blower to purge the chamber of any products of combustion or gas 2 The board...

Page 30: ...fifteen 15 seconds the module creates spark and opens valve NO Check for 12VDC between RED and YELLOW wires at the module board YES Check plug connection tot he Module Electrode and Wire Spark gap 1...

Page 31: ...Molex Edge Connector YES Verify voltage thru limit and sail switch to module board If circuit remains open for 30 seconds module board will go into lockout and shut down motor RESET thermostat Replac...

Page 32: ...ockout function of the module board After the blower has stopped the ignition sequence can be started again The module will try three times for ignition before lockout It is important to determine the...

Page 33: ...ator behind module board is in place d Make certain that the transformer voltage is within 24 30 volts A C e Be sure duct connections to furnace are airtight Seal duct collar connections to furnace ca...

Page 34: ...WIRE UL 3257 P 40 340312 TRANSFORMER THERMOSTAT TIME DELAY RELAY LIMIT SWITCH N C G CAPACITOR BR BR W MOTOR MODULE BOARD ELECTRODE BK BK G W G W DISCONNECT BLOCK BR G Y Y BR GROUNDING TERMINAL SAIL SW...

Page 35: ...VOIDS WARRANTY OF FURNACE UNIT 100 FIRE CHECKED NOTE ELECTRODE SAIL SWITCH N O SW N C LIMIT Y Y Y GROUNDING TERMINAL BR BK MOTOR VALVE SWITCH N C BL BK BK Y BR R Y O R BL THERMOSTAT R 12 V D C Y 12 V...

Page 36: ...ARD ELECTRODE GROUNDING TERMINAL BL THERMOSTAT R 12 V D C Y 12 V D C BL THERMOSTAT MOTOR SWITCH SAIL N O ELECTRODE MODULE BOARD V V 340512 14 AWG 105 C THERMOPLASTIC NO 18 250 C RADIX WIRE UL 3257 APP...

Page 37: ...rts in the top of the burner c Using a black felt tip pen mark a line along top of burner 3 16 from back of lance and parallel with lance Make an additional mark indication center line of the lance Se...

Page 38: ...r it is important for the electrode to be positioned properly over the top of the burner When replacing the electrode or should you be experiencing ignition type problems the electrode should be posit...

Page 39: ...t if a furnace has not been used it will not require cleaning NOT SO A furnace which has not been used for some time could be more in need of cleaning than a furnace which has been used extensively Du...

Page 40: ...676 Broadway Street Dayton Tennessee 37321 423 775 2131 Fax 423 775 7015 www RVComfort com All information published in this manual is subject to change without notice Suburban Division...

Reviews: