3.15”
5.90”
F
Fiig
gu
urre
e 7
7 –– C
Ca
ab
blle
e ssp
piirra
all w
wrra
ap
p a
an
nd
d A
AS
ST
T cca
ab
blle
e
10. Feed the pump AST cable through the bottom cover.
11. Remove and discard the four AST air cells (B).
12. Install the new AST air cells through the center belt.
13. Feed the pump AST cable through the bottom cover out to the pump.
14. Using rubbing alcohol, lubricate the two line manifold fitting and the AST air cell fittings.
15. Apply firm, constant force while you turn the AST air cell fitting back and forth to connect the AST air cell to the two line
manifold.
16. Install four nylon cable ties onto the two line manifold/AST air cell fittings.
17. Verify that the AST air cells inflates.
18. Move the fire barrier over the air cells toward the foot end to install the fire barrier.
19. Zip the fire barrier.
20. Zip the support surface top cover onto the bottom cover.
21. Run the pump diagnostic test. All tests must pass.
22. Verify proper operation before you return the product to service.
F
Fiirre
e b
ba
arrrriie
err rre
ep
plla
acce
em
me
en
ntt
T
To
oo
ollss rre
eq
qu
uiirre
ed
d::
•
None
P
Prro
occe
ed
du
urre
e::
1. Unzip and remove the support surface top cover.
2. Unclip the head end and foot end center belt retainers from the bottom cover.
3. Remove the CPR connector to allow the support surface to deflate.
4. Unzip the fire barrier.
5. Move the fire barrier over the side bolsters and air cells toward the head end to remove the fire barrier.
6. Reverse steps to reinstall.
7. Run the pump diagnostic test. All tests must pass.
8. Verify proper operation before you return the product to service.
B
Bo
ollsstte
err rre
ep
plla
acce
em
me
en
ntt,, lle
efftt a
an
nd
d rriig
gh
htt ssiid
de
e
T
To
oo
ollss rre
eq
qu
uiirre
ed
d::
•
Diagonal pliers
1. Unzip and remove the support surface top cover.
EN
18
2941-009-002 Rev B.0
Summary of Contents for 2941-000-001
Page 2: ......