BM69
STEP 9.
Make up (4) 1/2” bolt assemblies
consisting of the following: (1) #AZ Bolt and (1)
#VV Washer. Place (2) assemblies near the left
angle mount and (2) assemblies near the right
angle mount.
STEP 10.
At this time, use a lifting device
such as a crane (with a 500 lb lifting capacity)
to lift the #4180 ROPS Loop and lower into po-
sition.
(As shown in the 2 pictures)
If no lifting
device is available, please have (2) people lift
the #4180 ROPS loop and lower into position,
while another person is ready to line up 1/2”
bolt assemblies.
Make sure to steady the #4180
ROPS loop, prior to lowering into
position, as the over head bend of
the loop can quickly transfer its’ weight po-
tentionaly creating an unsafe situation.
STEP 11.
Using a punch or a long bolt as a
guide to line up the bolt holes, insert (1) Bolt As-
sembly from step 8, through the
middle hole
on the #4179 Back Channel, then through the
corresponding
middle hole
on the #4178 Bar
Spacer, through the Left Angle Mount and fi-
nally through the the left side of the #4180
ROPS Loop. Loosely attach a #VV Washer and
then an #AS Nut.
Leave loose.
Do the same
process to the
middle hole
on the right side.
STEP 12.
Applying the same process from
step 10, thread a 1/2” bolt assembly through the
top hole
on the #4179 Back Channel, then
through the corresponding
top hole
on the
#4178 Bar Spacer, through the Left Angle
Mount and finally through the the left side of the
#4180 ROPS Loop. Loosely attach a #VV
Washer and then an #AS Lock nut.
Leave
loose.
Do the same process to the
top hole
on
the right side.
Tighten all (6) 1/2” bolt assemblies at this
time, including the lower bolt assemblies!
4180
ROPS Loop
4180
ROPS Loop
Left Angle
Mount
4178
Spacer Bar
4179
Back Channel
TOP
MIDDLE
LOWER