BM108
Blade Drawbar Kit
BD7
001715
Drawbar
(1)
AH
3/8-16x1 Spin Lock Bolt
(4)
JJ
3/8-16 Spin Lock Nut
(4)
STEP 1.
Per Photo above, align top of #1715 Drawbar
with “top edge” of Dozer Blade.
STEP 2.
Clamp Drawbar in position and using the four
(4) 3/8” holes in Drawbar as a template, drill four 3/8” holes
in Dozer Blade.
STEP 3.
Using AH Bolts & JJ Nuts secure Drawbar to
Dozer Blade top edge... fully tighten Nuts.
1715 Drawbar
AH Bolt
& JJ Nut
AH Bolt
& JJ Nut
Dozer Blade
PARTS & FASTENERS LIST