T
HE
D
EPLOYMENT
B
AG
The Quasar II deployment bag is constructed of para-pak and contains no Velcro® closures
to wear out. It utilizes two locking stows and can be fitted with either rubber bands or ‘Tube Stoes’.
1. After packing your canopy according to its manufacturer’s instructions, S-fold it and place it into
the bag. Ensure that all excess bridle or deflation line is pulled out through the bag's grommet and
the ring located on the canopy is seated against the grommet.
2. Lock the bag closed with two bights of suspension line, then stow the remainder of the lines across
the bottom of the bag. Leave approximately 18” of line free between the last line stow and the top
of the risers.
Note:
If you have installed a Strong Enterprises collapsible pilot chute, it must now be “Inflated”.
First ensure that the canopy’s bridle attachment ring (or Link) is seated firmly against the bag’s
grommet without capturing any canopy fabric. Now pull the pilot chute handle away from the bag
until all of the deflation line rests inside of the hollow bridle. Check window in bridle to make sure
pilot chute is cocked.
Failure to do so may result in a pilot chute in tow malfunction.
C
LOSING THE
C
ONTAINER
1. Thread a pull up cord through the main container closing loop.
2. Place the bag into the pack tray with the lines oriented toward the bottom of the container and
route the risers neatly down both sides of the rig and into the pack tray.
3. Lift up on the pull up cord while you rotate the bag downward and seat it firmly into the container.
4. Close the bottom flap first.Then the top flap. With
the bridle exiting to the right, temporarily insert-
ing the bridle’s curved ripcord pin.
28
Quasar II Owners Manual Rev.C 11/2000
Strong Enterprises