A
TTACHING THE
P
ILOT
C
HUTE AND
D
EPLOYMENT
B
AG
1. To attach, pass the loop at the end of the pilot chute bridle through the bag’s grommet. The loop
should extend out of the grommet on the inside of the bag.
2. Now pass the loop through the metal ring, which is sewn to the top of your canopy, and then pass
the entire pilot chute and deployment bag back through the loop and pull tight
Note:: If your canopy does not have a metal ring but simply a loop made of nylon webbing, then the
use of a rapid link is necessary for attachment. DO NOT tie the bridle directly to the canopy
without a ring or rapid link. This will cause canopy fabric to be pulled through the bag’s
grommet upon deployment causing canopy damage.
A
TTACHING THE
O
PTIONAL
C
OLLAPSIBLE
P
ILOT
C
HUTE
/B
AG
A
SSEMBLY
Assembly
1. Insert free end of bridle with deflation line
and retainer into grommet in top of bag (mini-
mum grommet size #4).
2. Insert #4 Rapide link in bridle loops on
inside of bag. Make sure deflation line (white
Spectra) is in the center of link.
3. Attach deflation line and retainer strap (Type
I 9/16") to canopy attachment point with #4
Rapide link.
Operation
1. Pack the canopy per manufacturer's instruc-
tion
2. S-fold the canopy into the D-bag.
3. Pull all the excess line out of the D-bag
through the grommet. The connector link at the
canopy should lay against the bag grommet
without pinching any material.
4. Lock the bag and stow the remainder of the
lines in the normal manner.
5. Place the bag in the pack tray so that it will
not slide.
6. Grasp the pilot chute handle and pull it until
all slack line is inside the bridle. Check win-
dow to see P/C is cocked.
7. Close the container in the normal manner.
27
Quasar II Owners Manual Rev.C 11/2000
Strong Enterprises
Bridle
Grommet
Retainer strap
Deflation line
Rapide link #4
Rapide link #4
Canopy attachment