Selecting a UPS Unit for ftServer Systems
AC Power Planning
2-5
W A R N I N G
!
A qualified electrician must supply and hardwire the UPS
AC input cord, and if required an AC output cord,
distribution panel, or conduit to each UPS unit in
compliance with local and national electrical code.
A V E R T I S S E M E N T
!
Un électricien qualifié doit fournir et relier le câble d’entrée
CA de l’onduleur, et si besoin, un câble de sortie CA, un
panneau de distribution ou un conduit à chaque système
d’onduleur, conformément au code électrique local et
national.
Table 2-3. UPS to PDU AC Power Cords for Qualified UPS Models
UPS Model
UPS to PDU Power Cord
Chloride - LT081XAT-0H8SX
The A-side and B-side PDU AC input cords plug into L6-20R
receptacles on the A-side and B-side UPS units respectively.
Chloride - LT081XIT-0E3KX
Use two B52700-45V power cords for the A-side and B-side
PDU AC input cords. These cords plug into the IEC C19
receptacles on the A-side and B-side UPS units respectively.
Chloride - LT081XJT-0H0SX
The A-side and B-side PDU AC input cords plug into L6-20R
receptacles on the A-side and B-side UPS units respectively.
APC - SYH4K6RMT and
SYA8K16RMP
The A-side and B-side PDU AC input cords plug into L6-20R
receptacles on the A-side and B-side UPS units respectively.
APC - SYH4K6RMI, SYA8K16RMT,
and SYA8K16RMI
Use two B52700-45V power cords for the A-side and B-side
PDU AC input cords. These cords plug into the IEC C19
receptacles on the A-side and B-side UPS units respectively.
APC - SYH4K6RMJ and
SYA8K16RMJ
The A-side and B-side PDU AC input cords plug into L6-20R
receptacles on the A-side and B-side UPS units respectively.