Preparing to Install a System
1-8
Stratus ftServer V 2302, V 4304, and V 6308 Systems: Site Planning Guide
(R624)
Preparing to Take Delivery of a System
Before you take delivery of your system, perform the following tasks:
1. Secure traffic permits for the delivery vehicle and security clearances for moving
the shipping container within your facility if necessary.
2. Determine a suitable delivery site with enough space for unloading the system.
3. Make sure that the delivery site will accommodate the delivery vehicle.
N O T E
Depending on the system configuration and the
components you have ordered, a separate carton
containing components may be shipped with your system.
When your system arrives, perform the following tasks:
Contact the CAC.
Check the Tip-N-Tell and Shockwatch motion sensors to determine if they have
been activated. If a sensor has been activated, or if there is any damage, report it
immediately to the carrier and to the CAC.
Check the packing list. If you received the wrong shipment, or if the shipment is
incomplete, report it immediately to the carrier and to the CAC.
Moving the System to the Installation Site
Before moving your system to the installation site, perform the following tasks:
N O T E
Moving a system requires
two
able-bodied persons.
1. Obtain a forklift or pallet jack to move your system from the delivery area to the
installation site.
2. Check the dimensions of doorways and the load capacities of floors and elevators.
You should walk the path over which you will move the system to ensure that it can
be easily moved to the installation site. If your system will not fit through the
doorways, you may need to arrange for rigging.