
uPrint/uPrint SE Service Manual
9-5
Controller Board Checklist
Use this checklist when replacing the Controller Board. Due to possible software version
conflicts, additional steps must be taken after installing a Controller Board - the complete (X,
Y, Z) homing process must be run before building a part. Failure to perform these steps may
result in Z build location and/or cartridge read issues. This problem will be corrected in the
next board firmware release.
Procedure
Unload material.
Power down the system.
Replace the controller board.
Power up the system
When prompted, download the system software.
Enter Head Maintenance. This will cause the system to run the complete homing process.
Exit Head Maintenance
Load material.
Run a small test part to ensure part quality is acceptable and that the XY table is functioning
correctly.
Discuss with the customer any questions or issues they may have.
Pack the old controller board into the shipping box along with the RMA documentation and
ship back to Stratasys.
Summary of Contents for uPrint
Page 1: ...uPrint and uPrint Plus uPrint SE and uPrint SE Plus Service Manual Part No 209010 0001 Rev D...
Page 11: ...1 2...
Page 35: ...2 24...
Page 179: ...4 132 Figure 4 231 uPrint Plus and uPrint SE Plus measurement points and worksheet BL FL FR BR...
Page 207: ...4 160 Figure 4 275 uPrint and uPrint SE measurement points and worksheet BL FL FR BR...
Page 267: ...5 58...
Page 343: ...6 76...
Page 359: ...7 16...
Page 373: ...8 14...