
2-2
What happens when...
Powering up
Once the unit is ready to build, the display will show
Idle
(no part in the queue) or
Ready to
build
followed by the part name. Once a part is started the appropriate liquefier will begin to
heat. Once the liquefier and chamber reach the operating temperature (310C model, 300C
support, 77 Chamber) the system will begin to build a part.
Summary of Contents for uPrint
Page 1: ...uPrint and uPrint Plus uPrint SE and uPrint SE Plus Service Manual Part No 209010 0001 Rev D...
Page 11: ...1 2...
Page 35: ...2 24...
Page 179: ...4 132 Figure 4 231 uPrint Plus and uPrint SE Plus measurement points and worksheet BL FL FR BR...
Page 207: ...4 160 Figure 4 275 uPrint and uPrint SE measurement points and worksheet BL FL FR BR...
Page 267: ...5 58...
Page 343: ...6 76...
Page 359: ...7 16...
Page 373: ...8 14...