background image

3

POWER CONSUMPTION

WORKSTATION REQUIREMENTS 

For details, see the CatalystEX Workstation Requirements document available from the Stratasys website.

ELECTRICAL REQUIREMENTS 

AC POWER REQUIREMENTS

• 

50/60 Hz

• 

100-240 VAC

• 

15-7A

• 

1200W dedicated circuit

• 

The grounded electrical outlet must connect to either a Euro or a US power cord plug provided 

and must be located within 2 m (80 inches) of the printer.

Operation of the printer outside this range is not recommended; degradation of performance and shortened 
component life expectancy will be experienced. 

LAN REQUIREMENTS

A LAN connection is required for communication and file transfer functions.

The LAN connection is a 100 base T, Ethernet protocol, RJ45 connector. One CAT5, 10/100 base T cable is 
supplied with the printer, located in the Startup Kit.

The LAN connection must be located within 4 m (14 feet) of the printer.

The printer will function in either DHCP or Static IP configurations.

Power Consumption 
(while building)

~1080W

Caution: 

Do not use an extension cord or power strip; doing so can result in

intermittent power issues. Connect the power cord directly into the receptacle or
UPS.

Note: 

Printers configured with a network option of UPnP=ON will occasionally 

broadcast a unique system identifier across the network for use by the Catalyst 
software application.

Refer to Catalyst’s user information for workstation requirements. 

Summary of Contents for BST1200es

Page 1: ...Part No 400734 0001_REV_A Dimension BST1200es SST1200es SITE PREPARATION GUIDE...

Page 2: ...ith Stratasys per software copyright No part of this document may be photocopied reproduced or translated into another language without the prior written consent of Stratasys Inc All drawings and info...

Page 3: ...Consumption 3 WORKSTATION REQUIREMENTS 3 ELECTRICAL REQUIREMENTS 3 AC Power Requirements 3 LAN REQUIREMENTS 3 UNINTERRUPTIBLE POWER SUPPLY UPS 4 USE AND INSTALLATION 4 GENERAL INFORMATION 4 Parts Lis...

Page 4: ...ass the ground lead Know the location of equipment branch circuit interrupters or circuit breakers and how to turn them on and off in case of emergency Know the location of fire extinguishers and how...

Page 5: ...05 mm User Interface with Display Panel and Keypad HOW TO USE THIS GUIDE This guide provides information for selecting an appropriate location for the Dimension 1200es printer Information of particula...

Page 6: ...door use only Air quality conditions with excessive solid particulates conductive or non conductive may result in system damage Air quality conditions in which airborne oils are allowed to accumulate...

Page 7: ...uired for communication and file transfer functions The LAN connection is a 100 base T Ethernet protocol RJ45 connector One CAT5 10 100 base T cable is supplied with the printer located in the Startup...

Page 8: ...Refer to the UPS and I O Module if used Installation and Operation Guides for instructions on installing the I O module if used into the UPS unit as well as for connecting AC power to the UPS and 3D p...

Page 9: ...Plug 9Pos AMP 205204 9 2 2 Pin Male 24 20 AWG AMP 1 66506 0 3 1 Shell Size 1 9 Pin w Grommets AMP 748677 1 4 2 Jackscrew Pair 4 40 Knurled AMP 747784 3 5 XX x Cable 2 Conductor 22 AWG ALPHA 1172C or...

Page 10: ...6 Figure 2 UPS Cable Diagram...

Page 11: ...2 2 m 86 6 in wide and 1 9 m 74 8 in deep For detailed unpacking and setup instructions refer to Chapter 3 of the Dimension BST SST 1200es User Guide SITE PREPARATION CHECKLIST ELECTRICAL INSTALLATION...

Page 12: ...aterials and applications call 888 480 3548 or visit www stratasys com DOCUMENTATION FEEDBACK Customers resellers and Stratasys employees are encouraged to send comments about our documentation and tr...

Reviews: