3
POWER CONSUMPTION
WORKSTATION REQUIREMENTS
For details, see the CatalystEX Workstation Requirements document available from the Stratasys website.
ELECTRICAL REQUIREMENTS
AC POWER REQUIREMENTS
•
50/60 Hz
•
100-240 VAC
•
15-7A
•
1200W dedicated circuit
•
The grounded electrical outlet must connect to either a Euro or a US power cord plug provided
and must be located within 2 m (80 inches) of the printer.
Operation of the printer outside this range is not recommended; degradation of performance and shortened
component life expectancy will be experienced.
LAN REQUIREMENTS
A LAN connection is required for communication and file transfer functions.
The LAN connection is a 100 base T, Ethernet protocol, RJ45 connector. One CAT5, 10/100 base T cable is
supplied with the printer, located in the Startup Kit.
The LAN connection must be located within 4 m (14 feet) of the printer.
The printer will function in either DHCP or Static IP configurations.
Power Consumption
(while building)
~1080W
Caution:
Do not use an extension cord or power strip; doing so can result in
intermittent power issues. Connect the power cord directly into the receptacle or
UPS.
Note:
Printers configured with a network option of UPnP=ON will occasionally
broadcast a unique system identifier across the network for use by the Catalyst
software application.
Refer to Catalyst’s user information for workstation requirements.