Maintenance
Model 6DS-SP Planarizer
4 - 8
Version 4.0 - February 1998
BRIDGE DRIVE ASSEMBLY
The bridge assembly encloses and supports the left and right spindle assemblies
and their associated hardware. The bridge assembly moves the wafer carriers
between the load stations and the polish table; during the polishing cycle it
oscillates the wafer carriers and wafers over the surface of the polish table. The
bridge also oscillates over the second polish table when the second table option
is installed.
The bridge assembly is supported by two rails mounted on a solid framework.
Four linear bearing blocks, attached to the underside of the bridge assembly, ride
along the top of the rails. The drive assembly is a recirculating ball and lead
screw supported by the machine's framework at each end. Two pulleys and a
toothed drive belt connect the lead screw to a brushless DC servo motor. This
arrangement converts motor drive force into linear motion, moving the bridge
assembly left or right between the load stations and the polish table. The motor,
mounted to the machine's framework in the right side rear of the machine, is
accessible through the lower right side service door. Limit switches at each end
of the rails ensure the bridge assembly does not “run away”, crashing into the
side walls of the machine. Encoder feedback constantly reports back to the
control computer the exact position and velocity of the bridge assembly.
If the
curtain rinse option
is installed, after polishing the bridge pauses between
the polish table and the load stations to permit an extra rinsing of the carriers.
Curtain rinse type is chosen at page 2 of the Machine Parameters Menu. Curtain
rinse is enabled/disabled at page 3 of the Machine Parameters Menu. Curtain
rinse time is selected at page 3 of the Machine Parameters Menu. Table rinse
with curtain rinse is also enabled/disabled at page 3 of the Machine Parameters
Menu.
Summary of Contents for 6DS-SP
Page 1: ......
Page 19: ...Introduction INTRODUCTION...
Page 58: ......
Page 59: ...Introduction ACHINE ESCRIPTION...
Page 108: ...Introduction PERATOR UNCTIONS...
Page 131: ...Strasbaugh Operator Functions Version 4 0 February 1998 3 23 Figure 3 4 Menu Selection...
Page 134: ...Operations Model 6DS SP Planarizer 3 26 Version 4 0 February 1998 Figure 3 5 Home Machine Menu...
Page 145: ...Strasbaugh Operator Functions Version 4 0 February 1998 3 37 Figure 3 8 Recipe Management Menu...
Page 150: ...Operations Model 6DS SP Planarizer 3 42 Version 4 0 February 1998 Figure 3 9 Home Machine Menu...
Page 203: ...Introduction ACHINE ETUP...
Page 210: ...Strasbaugh Machine Setup Version 4 0 February 1998 4 7 Figure 4 2 Slurry Flush Menu...
Page 216: ...Strasbaugh Machine Setup Version 4 0 February 1998 4 13 Figure 4 4 Polish Parameters Menu...
Page 254: ...Strasbaugh Machine Setup Version 4 0 February 1998 4 51 Figure 4 13 Password Menu...
Page 258: ...Introduction TROUBLESHOOTING...
Page 267: ...Strasbaugh Troubleshooting Version 4 0 February 1998 5 9 Figure 13 1 Alarm Log Menu...
Page 326: ...Introduction APPENDICES...
Page 329: ...Introduction LECTRIAL NPUT UTPUT...
Page 331: ...Operations Model 6DS SP Planarizer This page intentionally left blank...
Page 332: ......
Page 356: ...Introduction REVISIONS...
Page 357: ...Introduction INTRODUCTION...
Page 396: ......
Page 407: ...Strasbaugh Installation Version 4 0 February 1998 Update 11 06 01 2 11 U...
Page 421: ...Introduction HYSICAL ESCRIPTION...
Page 444: ...Introduction ECHANICAL ESCRIPTION...
Page 463: ...Introduction CONTROL SYSTEM DESCRIPTION...
Page 470: ...Introduction OWER ISTRIBUTION...
Page 479: ...Introduction LUMBING ESCRIPTION...
Page 490: ...Introduction REVENTATIVE AINTENANCE CHEDULES...
Page 507: ...Introduction ECHANICAL AINTENANCE ROCEDURES...
Page 516: ......
Page 691: ...Introduction OFTWARE ALIBRATION ROCEDURES...
Page 862: ...Introduction NEUMATIC DJUSTMENTS...
Page 897: ...Introduction OFTWARE ONTROL OMPUTER AINTENANCE...
Page 912: ...Introduction TROUBLESHOOTING...
Page 921: ...Strasbaugh Troubleshooting Version 4 0 February 1998 13 9 Figure 13 1 Alarm Log Menu...
Page 981: ......
Page 1005: ...Introduction APPENDICES...
Page 1006: ...Introduction ALIBRATION ARIABLES IST...
Page 1008: ...Maintenance Model 6DS SP Planarizer This page intentionally left blank...
Page 1094: ...STRASBAUGH INC May 31 2001 Ver 4 37 6DS SP User Interface Reference Page 21...
Page 1103: ...STRASBAUGH INC Page 30 6DS SP User Interface Reference May 31 2001 Ver 4 37...
Page 1467: ...Introduction SSEMBLY RAWINGS...
Page 1469: ...Maintenance Model 6DS SP Planarizer This page intentionally left blank...
Page 1470: ...Introduction ARTS IST...
Page 1471: ...Introduction LECTRICAL NPUT UTPUT...
Page 1473: ...Maintenance Model 6DS SP Planarizer This page intentionally left blank...
Page 1474: ...Introduction PTIONS...
Page 1476: ...Strasbaugh Appendices Version 4 0 February 1998 Appendix D Options...
Page 1477: ...Maintenance Model 6DS SP Planarizer This page intentionally left blank...
Page 1478: ...Introduction AINTENANCE OG HEETS...
Page 1479: ...Strasbaugh Appendices Version 4 0 February 1998 Appendix E Maintenance Log Sheets...
Page 1480: ...Maintenance Model 6DS SP Planarizer This page intentionally left blank...
Page 1481: ......
Page 1482: ......
Page 1483: ......
Page 1484: ......
Page 1485: ......
Page 1508: ...Introduction APPENDICES...
Page 1509: ...Strasbaugh Appendices Version 4 0 February 1998 Appendix F Manufacturer Data Attached CD...
Page 1510: ...Maintenance Model 6DS SP Planarizer This page intentionally left blank...
Page 1511: ......
Page 1534: ...Introduction APPENDICES...
Page 1535: ...Strasbaugh Appendices Version 4 0 February 1998 Appendix F Part 2 Manufacturers Data Sheets...
Page 1536: ...Maintenance Model 6DS SP Planarizer This page intentionally left blank...
Page 1537: ......
Page 1560: ...Introduction APPENDICES...
Page 1562: ...Maintenance Model 6DS SP Planarizer This page intentionally left blank...