background image

Hi-Lift

by

INSTRUCTIONS (CONTINUED)

Bracket Installation

1.

Begin by matching each pulley to a corresponding mounting bracket.  Square holes to
square holes, round holes to round holes.

2.

Lay the mounting brackets with their corresponding pulleys on the floor in the direction
they should be mounted.  [See image].

"Locking hinge" 

 faces outward.

Pulley should be on side

closest to "double pulley".

Now remove the mounting brackets from the pulleys and attach them to the selected
overhead joist with the provided screws.  It is best to use a small diameter drill bit to
drill pilot holes for the screws.   
 

3.

4.

Attach the pulleys to the mounting brackets with the provided nuts and bolts.  Holes
should already align properly in the same manner as when laid out on the floor.

Rope Installation

A.

Now that all ceiling mounts are attached it's time to add the rope.  Jump to 1:23 in
the suggested video for simplest "how to"!  Or...

B.

Knot one end of the rope.  Then, take the
opposite end and feed it through the "single
pulley system" in the following direction, as
shown in the image to the right.

Knot

#2

#3

Knot   >   #2   >   #3

(down hole in

bracket)

PRO

Reviews: