Pre-installation Checklist
On the following pages, verify that all issues have been addressed and resolved.
Circle either “Yes” or “No” for each item. For unresolved issues, assign a
required action with a due date to the appropriate person.
Table 5-1. Pre-installation Checklist
Item Description
Yes/No
Action Required/Due
Date/Person Responsible
Site Preparation
Floor plans completed
Clearance adequate
Cooling adequate
Power requirements met
Cable lengths determined
Cable routing established
Future expansion considered
Dock facilities scheduled
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Hardware Procurement
Subsystems ordered
Power cables ordered
Options or features ordered
Interface cables ordered
Interface adapters ordered
Tapes and labels ordered
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Software Procurement
Software prerequisites met
Yes/No
Summary of Contents for 9710
Page 1: ...9710 Library Storage Module System Assurance Guide Document MR0012 ...
Page 2: ......
Page 3: ...9710 Library Storage Module System Assurance Guide ...
Page 12: ...Tables x 9710 System Assurance Guide MR0012J This page intentionally left blank ...
Page 18: ...Preface xvi 9710 System Assurance Guide MR0012J This page intentionally left blank ...
Page 35: ...MR0012J 9710 System Assurance Guide 3 7 Host Interfaces Figure 3 5 Host Indirect Connection ...
Page 52: ...SCSI Cabling 4 12 9710 System Assurance Guide MR0012J Figure 4 6 SCSI Connector Types ...
Page 80: ...A 6 9710 System Assurance Guide MR0012J This page intentionally left blank ...
Page 85: ......